Performance of neutron beam system for accelerator-based boron neutron capture therapy
Vladislav Veksleman , Mark Harrison , Kirill Martianov , Anatoly B. Muchnikov , Aleksandr Makarov , Yong Jiang , Ken Franzen , Alexander Ivanov , Michael Meekins , Chad Lee , Alexander Dunaevsky
Advances in Radiotherapy & Nuclear Medicine ›› 2025, Vol. 3 ›› Issue (4) : 94 -101.
Performance of neutron beam system for accelerator-based boron neutron capture therapy
A neutron beam system (NBS) based on an electrostatic proton accelerator designed for accelerator-based boron neutron capture therapy has been installed in Xiamen Humanity Hospital in China. The NBS has been used for patient treatments since October 2023, after more than a year of preliminary studies. By the end of 2024, more than 50 treatments had been executed. NBS uptime during 2024 was above 96%. Repeatability of the beam parameters was well within 2%. At present, configuration with only one treatment room operational, the overall machine usage, including clinical use, physics and dosimetry measurements, and biological experiments, has reached 27% of its capacity.
Boron neutron capture therapy / Accelerator-based boron neutron capture therapy / Neutron beam system / Tandem accelerator / Proton beam / Lithium target
| [1] |
|
| [2] |
|
| [3] |
|
| [4] |
|
| [5] |
|
| [6] |
International Atomic Energy Agency Physics Section.Advances in Boron Neutron Capture Therapy. IAEA; 2023. Last accessed on 2025 Jul 28]. |
| [7] |
|
| [8] |
|
| [9] |
|
| [10] |
|
| [11] |
|
| [12] |
|
| [13] |
|
| [14] |
|
| [15] |
|
| [16] |
|
/
| 〈 |
|
〉 |