An ODE-augmented matheuristic for the permutation flow shop scheduling problem with thermally driven processing times

Neus Garrido , Sandra Oltra-Crespo , Lucía Agud-Albesa , Daniel López-Rodríguez , Ángel A. Juan

AIMS Mathematics ›› 2026, Vol. 11 ›› Issue (7) : 19545 -19566.

PDF (5769KB)
AIMS Mathematics ›› 2026, Vol. 11 ›› Issue (7) :19545 -19566. DOI: 10.3934/math.2026794
Research article
research-article
An ODE-augmented matheuristic for the permutation flow shop scheduling problem with thermally driven processing times
Author information +
History +
PDF (5769KB)

Abstract

This work analyzes a dynamic extension of the permutation flow shop scheduling problem (PFSP) in which processing times depend on the evolution of machine states. The proposed matheuristic combines a constructive heuristic, a biased randomization strategy, and a system of ordinary differential equations (ODEs) that models the thermal behavior of machines. This integration allows scheduling decisions to interact directly with time-varying machine conditions, producing schedules that adapt to operational degradation effects. The proposed ODE-enhanced matheuristic is evaluated on classical benchmark instances ranging from 20 to 100 jobs and up to 20 machines. Processing times are modified through a state-dependent thermal model that introduces performance degradation as machine load increases. The computational study compares static schedules, the dynamic evaluation of those schedules, and the solutions obtained by the proposed method. The results show that ignoring thermal effects leads to a substantial increase in makespan. In contrast, the proposed matheuristic consistently mitigates this degradation, achieving average improvements of 36.2%, 26.4%, and 25.9% with respect to the dynamically evaluated static solutions. Furthermore, the proposed approach reduces the dispersion of makespan values across instances, indicating improved robustness under thermal fluctuations.

Keywords

permutation flow shop problem / dynamic processing times / matheuristics / first-order differential equations / thermodynamics / thermal stress

Cite this article

Download citation ▾
Neus Garrido, Sandra Oltra-Crespo, Lucía Agud-Albesa, Daniel López-Rodríguez, Ángel A. Juan. An ODE-augmented matheuristic for the permutation flow shop scheduling problem with thermally driven processing times. AIMS Mathematics, 2026, 11 (7) : 19545-19566 DOI:10.3934/math.2026794

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

J. M. Framinan, J. N. D. Gupta, R. Leisten, A review and classification of heuristics for permutation flow—shop scheduling with makespan objective, J. Oper. Res. Soc., 55 (2004), 1243-1255. https://doi.org/10.1057/palgrave.jors.2601784

[2]

R. Ruiz, C. Maroto, A comprehensive review and evaluation of permutation flowshop heuristics, Eur. J. Oper. Res., 165 (2005), 479-494. https://doi.org/10.1016/j.ejor.2004.04.017

[3]

T. C. E. Cheng, Q. Ding, B. M. Lin, A concise survey of scheduling with time—dependent processing times, Eur. J. Oper. Res., 152 (2004), 1-13. https://doi.org/10.1016/S0377—2217(02)00909—8

[4]

S. Chorghe, R. Kumar, M. S. Kulkarni, V. Pandhare, B. K. Lad, Smart scheduling for next generation manufacturing systems: a systematic literature review, J. Intell. Manuf., 36 (2025), 4447-4476. https://doi.org/10.1007/s10845—024—02484—2

[5]

W. C. Lee, C. C. Wu, C. C. Wen, Y. H. Chung, A two—machine flowshop makespan scheduling problem with deteriorating jobs, Comput. Ind. Eng., 54 (2008), 737-749. https://doi.org/10.1016/j.cie.2007.10.010

[6]

Z. W. Sun, D. Y. Lv, C. M. Wei, J. B. Wang, Flow shop scheduling with shortening jobs for makespan minimization, Mathematics, 13 (2025), 363. https://doi.org/10.3390/math13030363

[7]

P. A. Villarinho, J. Panadero, L. S. Pessoa, A. A. Juan, F. L. Cyrino Oliveira, A simheuristic algorithm for the stochastic permutation flow—shop problem with delivery dates and cumulative payoffs, Int. Trans. Oper. Res., 28 (2021), 716-737. https://doi.org/10.1111/itor.12862

[8]

M. Nawaz, E. E. Enscore, I. Ham, A heuristic algorithm for the m—machine, n—job flow—shop sequencing problem, Omega, 11 (1983), 91-95. https://doi.org/10.1016/0305—0483(83)90088—9

[9]

J. Belloso, A. A. Juan, J. Faulin, An iterative biased—randomized heuristic for the fleet size and mix vehicle—routing problem with backhauls, Int. Trans. Oper. Res., 26 (2019), 289-301. https://doi.org/10.1111/itor.12379

[10]

´E. Taillard, Benchmarks for basic scheduling problems, Eur. J. Oper. Res., 64 (1993), 278-285. https://doi.org/10.1016/0377—2217(93)90182—M

[11]

A. N. H. Zaied, M. M. Ismail, S. S. Mohamed, Permutation flow shop scheduling problem with makespan criterion: Literature review, J. Theor. Appl. Inf. Technol., 99 (2021), 830-848.

[12]

L. H. Sun, K. Cui, J. H. Chen, J. Wang, X. C. He, Research on permutation flow shop scheduling problems with general position—dependent learning effects, Ann. Oper. Res., 211 (2013), 473-480. https://doi.org/10.1007/s10479—013—1481—6

[13]

Y. Y. Lu, Research on no—idle permutation flowshop scheduling with time—dependent learning effect and deteriorating jobs, Appl. Math. Model., 40 (2016), 3447-3450. https://doi.org/10.1016/j.apm.2015.09.081

[14]

X. Xin, Q. Jiang, C. Li, S. Li, K. Chen, Permutation flow shop energy—efficient scheduling with a position—based learning effect, Int. J. Prod. Res., 61 (2023), 382-409. https://doi.org/10.1080/00207543.2021.2008041

[15]

A. A. Juan, B. B. Barrios, E. Vallada, D. Riera, J. Jorba, A simheuristic algorithm for solving the permutation flow shop problem with stochastic processing times, Simul. Model. Pract. Theory, 46 (2014), 101-117. https://doi.org/10.1016/j.simpat.2014.02.005

[16]

E. M. Gonzalez—Neira, J. R. Montoya—Torres, J. F. Jimenez, A multicriteria simheuristic approach for solving a stochastic permutation flow shop scheduling problem, Algorithms, 14 (2021), 210. https://doi.org/10.3390/a14070210

[17]

J. Castaneda, X. A. Martin, M. Ammouriova, J. Panadero, A. A. Juan, A fuzzy simheuristic for the permutation flow shop problem under stochastic and fuzzy uncertainty, Mathematics, 10 (2022), 1760. https://doi.org/10.3390/math10101760

[18]

E. M. González—Neira, A. M. Urrego—Torres, A. M. Cruz—Riveros, C. Henao—García, J. R. Montoya— Torres, L. P. Molina—Sánchez, et al., Robust solutions in multi—objective stochastic permutation flow shop problem, Comput. Ind. Eng., 137 (2019), 106026. https://doi.org/10.1016/j.cie.2019.106026

[19]

K. Katragjini, E. Vallada, R. Ruiz, Flow shop rescheduling under different types of disruption, Int. J. Prod. Res., 51 (2013), 780-797. https://doi.org/10.1080/00207543.2012.666856

[20]

P. Valledor, A. Gomez, P. Priore, J. Puente, Solving multi—objective rescheduling problems in dynamic permutation flow shop environments with disruptions, Int. J. Prod. Res., 56 (2018), 6363-6377. https://doi.org/10.1080/00207543.2018.1468095

[21]

G. Mosheiov, Scheduling jobs under simple linear deterioration, Comput. Oper. Res., 21 (1994), 653-659. https://doi.org/10.1016/0305—0548(94)90080—9

[22]

S. Alaswad, Y. Xiang, A review on condition—based maintenance optimization models for stochastically deteriorating system, Reliab. Eng. Syst. Saf., 157 (2017), 54-63. https://doi.org/10.1016/j.ress.2016.08.009

[23]

T. Yang, Y. Kuo, I. Chang, Tabu—search simulation optimization approach for flow—shop scheduling with multiple processors—a case study, Int. J. Prod. Res., 42 (2004), 4015-4030. https://doi.org/10.1080/00207540410001699381

[24]

R. Wallrath, M. B. Franke, Integration of MILP and discrete—event simulation for flow shop scheduling using Benders cuts, Comput. Chem. Eng., 189 (2024), 108809. https://doi.org/10.1016/j.compchemeng.2024.108809

[25]

E. Azab, M. Nafea, L. A. Shihata, M. Mashaly, A machine—learning—assisted simulation approach for incorporating predictive maintenance in dynamic flow—shop scheduling, Appl. Sci., 11 (2021), 11725. https://doi.org/10.3390/app112411725

[26]

Y. Fu, Z. Li, K. Gao, A. M. Fathollahi—Fard, Z. Zhang, Integrated scheduling of distributed manufacturing with assembly and distribution: State of the art, challenges, and future directions, Int. J. Prod. Res., 64 (2026), 4669-4710. https://doi.org/10.1080/00207543.2025.2602898

[27]

A. M. Fathollahi—Fard, L. Woodward, O. Akhrif, A scenario—based robust optimization model for the sustainable distributed permutation flow—shop scheduling problem, Ann. Oper. Res., 2024. https://doi.org/10.1007/s10479—024—05940—7

[28]

D. M. Lei, B. Su, M. Li, Cooperated teaching—learning—based optimisation for distributed two—stage assembly flow shop scheduling, Int. J. Prod. Res., 59 (2021), 7232-7245. https://doi.org/10.1080/00207543.2020.1836422

[29]

M. Torkashvand, F. Ahmadizar, H. Farughi, Distributed production assembly scheduling with hybrid flowshop in assembly stage, Int. J. Eng., 35 (2022), 1037-1055. https://doi.org/10.5829/IJE.2022.35.05B.19

[30]

G. H. Zhang, K. Y. Xing, G. Y. Zhang, Z. X. He, Memetic algorithm with meta—lamarckian learning and simplex search for distributed flexible assembly permutation flowshop scheduling problem, IEEE Access, 8 (2020), 96115-96128. https://doi.org/10.1109/ACCESS.2020.2996305

[31]

Y. D. Zuo, P. Wang, Z. Fan, M. Li, X. H. Guo, S. J. Gao, Minimizing fuzzy makespan in a distributed assembly flow shop by using an efficient artificial bee colony algorithm, J. Intell. Fuzzy Syst., 45 (2023), 7025-7046. https://doi.org/10.3233/JIFS—230592

[32]

L. Cheng, L. Wang, J. C. Cai, A regional biogeography—based optimization algorithm for the distributed assembly permutation flow—shop scheduling problem with fuzzy processing time, J. Intell. Fuzzy Syst., 46 (2024), 3827-3841. https://doi.org/10.3233/JIFS—235854

[33]

X. L. Jing, Q. K. Pan, L. Gao, Local search—based metaheuristics for the robust distributed permutation flowshop problem, Appl. Soft Comput., 105 (2021), 107247. https://doi.org/10.1016/j.asoc.2021.107247

[34]

K. R. Baker, Introduction to sequencing and scheduling , Wiley, 1974.

[35]

C. L. Quintero—Araujo, J. P. Caballero—Villalobos, A. A. Juan, J. R. Montoya—Torres, A biased— randomized metaheuristic for the capacitated location routing problem, Int. Trans. Oper. Res., 24 (2017), 1079-1098. https://doi.org/10.1111/itor.12322

PDF (5769KB)

0

Accesses

0

Citation

Detail

Sections
Recommended

/

〈 〉