Field-based performance evaluation of air-deck blasting in open-pit iron ore mines of Iran

Abbas Khajouei Sirjani , Farhang Sereshki , Mohammad Ataei , Manoj Khandelwal , Mohammad Amiri Hosseini

AIMS Geosciences ›› 2026, Vol. 12 ›› Issue (4) : 922 -946.

PDF (1729KB)
AIMS Geosciences ›› 2026, Vol. 12 ›› Issue (4) :922 -946. DOI: 10.3934/geosci.2026035
Research article
research-article
Field-based performance evaluation of air-deck blasting in open-pit iron ore mines of Iran
Author information +
History +
PDF (1729KB)

Abstract

Drilling and blasting operations directly influence fragmentation quality and downstream efficiency in open-pit mines. Air-deck blasting has been proposed as a charge-modification technique that may improve the spatial and temporal distribution of explosive energy within the blasthole. This study presents a field-scale comparative evaluation of conventional production designs and implemented bottom air-deck production designs under actual operating conditions in three Iranian open-pit iron ore mines: Gol-e-Gohar, Sadat-Siriz, and Smalon. A total of 36 production blasts were analyzed using a paired field-comparison framework. Fragmentation was quantified using image-based analysis and the D20, D50, and D80 indices, while powder factor, specific drilling, blasthole productivity, and mine-specific oversize fraction were also evaluated. Under the tested field conditions, the implemented bottom air-deck production designs were associated with finer image-based fragmentation, as indicated by leftward shifts of the cumulative particle-size distribution curves. The median fragment size, D50, decreased by approximately 19–33% across the studied mines. These changes were accompanied by approximately 20–22% reductions in powder factor, 8-10% reductions in specific drilling, and 9–11% increases in blasthole productivity. Paired statistical tests and linear mixed-effects models indicated statistically significant reductions in D20, D50, and D80 within the available paired dataset. However, because the trials were conducted under routine production conditions, some design parameters, including hole length, stemming length, explosive column length, and subdrilling, varied between the conventional and bottom air-deck designs. Therefore, the results represent the combined field performance of the implemented bottom air-deck production designs rather than the isolated effect of the air column alone. The findings indicate favorable performance under the investigated conditions, while further controlled studies with detailed rock-mass characterization and mechanistic monitoring are required before broader generalization.

Keywords

air-deck blasting / rock fragmentation / open-pit mining / blast design optimization / image-based fragmentation analysis

Cite this article

Download citation ▾
Abbas Khajouei Sirjani, Farhang Sereshki, Mohammad Ataei, Manoj Khandelwal, Mohammad Amiri Hosseini. Field-based performance evaluation of air-deck blasting in open-pit iron ore mines of Iran. AIMS Geosciences, 2026, 12 (4) : 922-946 DOI:10.3934/geosci.2026035

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Pal Roy P, Singh RB (2001) Air-decking principle and its applications in production and presplit blasting. CIM Bull 94: 60-64.

[2]

Jhanwar JC, Chakraborty AK, Anireddy HR, et al. (1999) Application of air decks in production blasting to improve fragmentation and economics of an open-pit mine. Geotech Geol Eng 17: 37-57. https://doi.org/10.1023/A:1008899928839

[3]

Jhanwar JC, Jethwa JL (2000) The use of air decks in production blasting in an open-pit coal mine. Geotech Geol Eng 18: 269-287. https://doi.org/10.1023/A:1016634231801

[4]

Roy SK, Singh RR, Kumar R, et al. (2008) Studies into possible use of air decking in solid blasting in Indian underground coal mines. Min Technol 117: 83-92. https://doi.org/10.1179/174328608X362659

[5]

Park D, Jeon S (2010) Reduction of blast-induced vibration in the direction of tunneling using an air-deck at the bottom of a blasthole. Int J Rock Mech Min Sci 47: 752-761. https://doi.org/10.1016/j.ijrmms.2010.04.011

[6]

Jhanwar JC (2011) Theory and practice of air-deck blasting in mines and surface excavations: A review. Geotech Geol Eng 29: 651-663. https://doi.org/10.1007/s10706-011-9425-x

[7]

Lu W, Hustrulid W (2003) A further study on the mechanism of air decking. Fragblast 7: 231-255. https://doi.org/10.1076/frag.7.4.231.23532

[8]

Fourney WL, Bihr S, Leiste U (2006) Borehole pressures in an air-decked situation. Fragblast 10: 47-60. https://doi.org/10.1080/13855140600858198

[9]

Rajak MK, Siva Subramanian KS, Prince MJA (2018) The effects of air-decking technique of blasting in surface mine: A brief review. J Emerg Technol Innov Res 5: 385-389.

[10]

Hayat MB, Alagha L, Ali D (2019) Air decks in surface blasting operations. J Min Sci 55: 922-929. https://doi.org/10.1134/S1062739119066307

[11]

Lou X, Zhou P, Yu J, et al. (2020) Analysis on the impact pressure on blast hole wall with radial air-decked charge based on shock tube theory. Soil Dyn Earthq Eng 128: 105905. https://doi.org/10.1016/j.soildyn.2019.105905

[12]

Li Q, Wei X, Li X, et al. (2024) Measurement and stress response analysis of complete history of blast-induced wall pressure for boreholes: A case with air-deck charge. Rock Mech Rock Eng 57: 9429-9443. https://doi.org/10.1007/s00603-024-04033-y

[13]

Yin Z, Wang X, Wang D, et al. (2022) Optimization of the air deck blasting parameters on the basis of the Holmquist-Johnson-Cook constitutive model. Fluid Dyn Mater Process 18: 257-269. https://doi.org/10.32604/fdmp.2022.017915

[14]

Rommayawes S, Leelasukseree C, Jaroonpattanapong P (2013) Influence of air-deck length on fragmentation in quarry blasting. Eur Sci J 3: 200-207.

[15]

Hong Z, Tao M, Feng S, et al. (2025) Experimental study of the impact of deck-charge structure on blast-induced fragmentation. Geomech Geophys Geo-Energy Geo-Resour 11. https://doi.org/10.1007/s40948-024-00915-1

[16]

Cheng R, Zhou Z, Chen W, et al. (2022) Effects of axial air deck on blast-induced ground vibration. Rock Mech Rock Eng 55: 1037-1053. https://doi.org/10.1007/s00603-021-02676-9

[17]

Balakrishnan V, Pradhan M, Dhekne PY (2019) Effect of distributed spherical air-gaps on performance of emulsion explosive. J Inst Eng India Ser D 100: 155-162. https://doi.org/10.1007/s40033-019-00189-y

[18]

Kabwe E (2019) Influence of air gap volume on achieving steady-state velocity of detonation. Min Metall Explor 36: 1179-1189. https://doi.org/10.1007/s42461-019-0095-1

[19]

Sadiq MR (2021) Implementasi bottom air deck dan expand pattern secara terintegrasi dalam rangka optimalisasi penggunaan bahan peledak di Pit South Pinang PT. Indones Min Prof J 3: 17-30. https://doi.org/10.36986/impj.v3i1.39

[20]

Kabwe E (2016) Improving collar zone fragmentation by top air-deck blasting technique. Geotech Geol Eng 35: 157-167. https://doi.org/10.1007/s10706-016-0094-7

[21]

Zarei M, Shahabi RS, Hadei MR, et al. (2022) The use of air decking techniques for improving surface mine blasting. Arab J Geosci 15: 1545. https://doi.org/10.1007/s12517-022-10826-8

[22]

Monjezi M, Amiri H, Seyed Mousavi MN, et al. (2023) Comparison and application of top and bottom air decks to improve blasting operations. AIMS Geosci 9: 16-33. https://doi.org/10.3934/geosci.2023002

[23]

Zhang XJ, Wang XG, Yu YL, et al. (2018) The application of deck charge technology in Huaneng open-pit mine. E3S Web Conf 38: 03031. https://doi.org/10.1051/e3sconf/20183803031

[24]

Baruti KR (2024) Assessing the importance of air-deck blasting in controlling BIGV at an open-pit gold mine in Tanzania using ANN model. Tanz J Eng Technol 43: 165-175. https://doi.org/10.52339/tjet.v43i2.965

[25]

Fan Y, Chen J, Leng Z, et al. (2024) Punching mechanism of air-deck stemming for drilling blasting and its influence on rock fragmentation. Rock Mech Rock Eng 57: 3917-3935. https://doi.org/10.1007/s00603-024-03773-1

[26]

Saharan MR, Sazid M, Singh TN (2017) Explosive energy utilization enhancement with air-decking and stemming plug “SPARSH”. Procedia Eng 191: 1211-1217. https://doi.org/10.1016/j.proeng.2017.05.297

[27]

Afrasiabian B, Ahangari K, Noorzad A (2021) Study on the effect of air deck on ground vibration and development of blast damage zone using 3D discrete element numerical method. Arab J Geosci 14: 1267. https://doi.org/10.1007/s12517-021-07648-5

[28]

Chandrahas NS, Choudhary BS, Venkataramayya MS, et al. (2025) An investigation of the cumulative impact of decking length and firing pattern on blasting results. J Min Environ 16: 97-110. https://doi.org/10.22044/jme.2024.14555.2743

[29]

Saqib S, Qureshi MU, Rashid HMA, et al. (2024) A field-scale investigation into the strategic location of air decks for improved blasting performance. Arch Min Sci 69: 391-407. https://doi.org/10.24425/ams.2024.151442

[30]

Arefmand E, Bakhshandeh Amnieh H, Majdi A, et al. (2025) Investigating the effect of air deck length on fragmentation caused by blasting in Nardaghi limestone mine Iran. J Rock Mech 9: 1-10. https://doi.org/10.22034/IRSRM.2025.54001.1973

[31]

Fattahi H, Amirabadi Farahani M, Ghaedi H (2025) Improving open-pit mining efficiency: Economic and operational benefits of the Power Deck method: A case study. J Min Environ 16: 1501-1519. https://doi.org/10.22044/jme.2025.14952.2849

[32]

Chiappetta RF (2004) New blasting technique to eliminate subgrade drilling, improve fragmentation, reduce explosive consumption and lower ground vibrations. J Explos Eng 21: 10-12.

[33]

Sazid M, Singh TN (2013) Mechanism of air deck technique in rock blasting: A brief review. Proceedings of the 4th Indian Rock Conference, Mumbai, India, 1-8.

[34]

Feng CC, Wang ZL, Wang JG, et al. (2024) A thermo-mechanical damage constitutive model for deep rock considering brittleness-ductility transition characteristics. J Cent South Univ 31: 2379‒2392. https://doi.org/10.1007/s11771-024-5700-x

[35]

Wang Z, Wang H, Wang J, et al. (2021) Finite element analyses of constitutive models performance in the simulation of blast-induced rock cracks. Comput Geotech 135: 104172. https://doi.org/10.1016/j.compgeo.2021.104172

[36]

Wang ZL, Li YC, Shen RF (2007) Numerical simulation of tensile damage and blast crater in brittle rock due to underground explosion. Int J Rock Mech Min Sci 44: 730‒738. https://doi.org/10.1016/j.ijrmms.2006.11.004

PDF (1729KB)

0

Accesses

0

Citation

Detail

Sections
Recommended

/

〈 〉