Layout design of a mixed-flow production line based on processing energy consumption and buffer configuration

Cai-Xia Zhang , Shu-Lin Dong , Hong-Yan Chu , Guo-Zhi Ding , Zhi-Feng Liu , Shi-Yao Guo , Chong-Bin Yang

Advances in Manufacturing ›› 2021, Vol. 9 ›› Issue (3) : 369 -387.

PDF
Advances in Manufacturing ›› 2021, Vol. 9 ›› Issue (3) : 369 -387. DOI: 10.1007/s40436-021-00354-1
Article

Layout design of a mixed-flow production line based on processing energy consumption and buffer configuration

Author information +
History +
PDF

Abstract

Green manufacturing is a growing trend, and an effective layout design method for production lines can reduce resource wastage in processing. This study focuses on existing problems such as low equipment utilization, long standby time, and low logistics efficiency in a mixed-flow parallel production line. To reduce the energy consumption, a novel method considering an independent buffer configuration and idle energy consumption analysis is proposed for this production line’s layout design. A logistics intensity model and a machine tool availability model are established to investigate the influences of independent buffer area configuration on the logistics intensity and machine tool availability. To solve the coupling problem between machine tools in such production lines, a decoupling strategy for the relationship between machine tool processing rates is explored. An energy consumption model for the machine tools, based on an optimized configuration of independent buffers, is proposed. This model can effectively reduce the idle energy consumption of the machine tools while designing the workshop layout. Subsequently, considering the problems encountered in workshop production, a comprehensive optimization model for the mixed-flow production line is developed. To verify the effectiveness of the mathematical model, it is applied to an aviation cabin production line. The results indicate that it can effectively solve the layout problem of mixed-flow parallel production lines and reduce the idle energy consumption of machine tools during production. The proposed buffer configuration and layout design method can serve as a theoretical and practical reference for the layout design of mixed-flow parallel production lines.

Keywords

Layout design / Energy consumption / Mixed flow production line / Independent buffer configuration

Cite this article

Download citation ▾
Cai-Xia Zhang, Shu-Lin Dong, Hong-Yan Chu, Guo-Zhi Ding, Zhi-Feng Liu, Shi-Yao Guo, Chong-Bin Yang. Layout design of a mixed-flow production line based on processing energy consumption and buffer configuration. Advances in Manufacturing, 2021, 9(3): 369-387 DOI:10.1007/s40436-021-00354-1

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Cao HJ, Li HC. The state-of-art and future development strategies of green manufacturing. China Mech Eng, 2020, 31(2): 135-144.

[2]

Duflou JR, Sutherland JW, Dornfeld D, et al. Towards energy and resource efficient manufacturing: a processes and systems approach. CIRP Ann Manuf Technol, 2012, 61(2): 587-609.

[3]

Hyunjei J, Sang DN, Cho YJ. An agile operations management system for green factory. Int J Precis Eng and Manuf Green Technol, 2014, 1: 131-143.

[4]

Ficko M, Palcic I. Designing a layout using the modified triangle method, and genetic algorithms. Int J Simul Model, 2013, 12(4): 237-251.

[5]

Ripon KSN, Glette K, Khan KN, et al. Adaptive variable neighborhood search for solving multiobjective facility layout problems with unequal area facilities. Swarm Evol Comput, 2013, 8: 1-12.

[6]

Giuseppe A, Giada L, Mario E. A multi objective genetic algorithm for the facility layout problem based upon slicing structure encoding. Expert Syst Appl, 2012, 39: 10352-10358.

[7]

Jeong KC, Kim YD. Heuristics for selecting machines and determining buffer capacities in assembly systems. Cumput Ind Eng, 2000, 38: 341-360.

[8]

Zhou J, Liu ZQ. Relationship between machine utilization and buffer capacity. Tool Eng, 2006, 40(9): 24-26.

[9]

Sahni S, Gonzalez T. P-complete approximation problems. J Assoc Comput Mach, 1976, 23(3): 555-565.

[10]

Liggett RS. Automated facilities layout: past, present and future. Autom Constr, 2000, 9(2): 197-215.

[11]

Drira A, Pierreval H, Hajri-Gabouj S. Facility layout problems: a survey. Ann Rev Control, 2007, 31(2): 255-267.

[12]

Kundu A, Dan PK. Metaheuristic in facility layout problems: current trend and future direction. Int J Ind Syst Eng, 2012, 10(2): 238-253.

[13]

Tarigan U, Ambarita MB. Production layout improvement by using line balancing and systematic layout planning (SLP) at PT.XYZ. Mater Sci Eng, 2018, 309(1): 012116.

[14]

Garcia-Hernandez L, Pierreval H, Salas-Morera L, et al. Handling qualitative aspects in unequal area facility layout problem: an interactive genetic algorithm. Appl Soft Comput J, 2013, 13(4): 1718-1727.

[15]

Jerzy G, Rafal M. A novel version of simulated annealing based on linguistic patterns for solving facility layout problems. Knowl-Based Syst, 2017, 124: 55-69.

[16]

Yang TH, Peters BA, Tu MG. Layout design for flexible manufacturing systems considering single-loop directional flow patterns. Eur J Oper Res, 2005, 164(2): 440-455.

[17]

Jaramillo JR (2007) The generalized machine layout problem. Dissertation, West Virgina University, Morgantown

[18]

Chen XF, Lu JS, Li YD et al (2010) Simulation decision-making study of buffer area allocation in workshop layout of a discrete manufacturing enterprise. J Zhejiang Univ Technol 38(3):246–250, 256

[19]

Chirici L, Wang KS. Tackling the storage problem through genetic algorithms. Adv Manuf, 2014, 2(3): 203-211.

[20]

Yang WQ, Deng L, Niu Q, et al. Warehouse scheduling performance analysis considering LHRL. Adv Manuf, 2013, 1(2): 136-142.

[21]

Bulgak AA. Analysis and design of split and merge unpaced assembly systems by metamodelling and stochastic search. Int J Prod Res, 2011, 44(18): 4067-4080.

[22]

Ding GT, Tu FS. Analysis of variance of output and state of a serial production line with different allocation of buffer capacities. J Nankai Univ, 1999, 32(4): 107-114.

[23]

Tan B. A three-station merge system with unreliable stations and a shared buffer. Math and Comput Model, 2001, 33(8): 1011-1026.

[24]

Diamantidis AC. Markovian analysis of a discrete material manufacturing system with merge operation, operation-dependent and idleness failures. Comput Ind Eng, 2006, 50(4): 466-487.

[25]

Meng FL, Tan DL, Huang XM. Research on buffer capacity in assembly system. Comput Intergr Manuf Syst, 2005, 11(11): 1609-1615.

[26]

Song SG, Li AP. Buffer capacity optimization in reconfigurable manufacturing system. Comput Intergr Manuf Syst, 2008, 14(10): 1951-1956.

[27]

Malathrons JP, Perkins JD. The availability of a system of two unreliable machines connected by an intermediate storage tank. AIIE Trans, 1982, 15(3): 195-201.

[28]

Yeralan S, Feanck WE. A continuous materials flow production line with station breakdown. Eur J Oper Res, 1986, 27(3): 289-300.

[29]

Li AP, Yu HB. Collaborative optimization method of buffer and facility layout in production lines based on NSGA-II algorithm. J Tongji Univ, 2016, 44(12): 1902-1909.

[30]

Bennett DP. A decomposition approach for an equipment selection and multiple product routing problem incorporating environmental factors. Eur J Oper Res, 2004, 156(3): 643-664.

[31]

He Y, Li YF. An energy-responsive optimization method for machine tool selection and operation sequence in flexible machining job shops. J Clean Prod, 2015, 87(1): 245-254.

[32]

Liu X (2008) Hybrid flow-shop scheduling problem based on saving energy. In: Proceedings of the 27th Chinese control conference, 16–18 July 2008, Kunming, China

[33]

Guo SL, Zhou Y, Yang HD. Minimizing energy consumption and tardiness penalty for fuzzy flow shop scheduling with state-dependent setup time. J Clean Prod, 2017, 147: 470-484.

[34]

Fadi S, Joaquin OM. Optimizing the production scheduling of a single machine to minimize total energy consumption costs. J Clean Prod, 2014, 67: 197-207.

[35]

Kan F, Nelson U. A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction. J Manuf Syst, 2011, 30: 234-240.

[36]

Wang W(2011) Research on energy consumption optimization oriented job shop scheduling methodology and development of its application environment. Dissertation, Harbin Inst Technol, Harbin

[37]

Liu ZF, Yan J, Cheng Q, et al. The mixed production mode considering continuous and intermittent processing for an energy-efficient hybrid flow shop scheduling. J Clean Prod, 2019, 246(2): 119071.

[38]

Liu N, Zhang YF, Lu WF. Improving energy efficiency in discrete parts manufacturing system using an ultra-flexible job shop scheduling algorithm. Int J Precis Eng Manuf Green Technol, 2019, 6: 349-356.

[39]

Liu Y, Dong HB, Lohse N. An investigation into minimising total energy consumption and total weighted tardiness in job shops. J Clean Prod, 2014, 65: 87-95.

[40]

Zhang L, Zhao XK, Ke QD. Disassembly line balancing optimization method for high efficiency and low carbon emission. Int J Precis Eng Manuf Green Technol, 2021, 8: 233-247.

[41]

Fang KT, Lin BMT. Parallel-machine scheduling to minimize tardiness penalty and power cost. Cumput Ind Eng, 2013, 64: 224-234.

[42]

Fahad M, Naqvi S, Atir M, et al. Energy management in a manufacturing industry through layout design. Proc Manuf, 2016, 8: 168-174.

[43]

Yang L, Deuse J, Jiang P. Multi-objective optimization of facility planning for energy intensive companies. J Intell Manuf, 2013, 24: 1095-1109.

[44]

Yang L, Deuse J, Jiang P. Multiple-attribute decision-making approach for an energy-efficient facility layout design. Int J Adv Manuf Technol, 2013, 66: 795-807.

[45]

Srinivas C, Satyanaraynab R. Determination of buffer size in single and multi row flexible manufacturing systems through simulation. Int J Eng Sci Technol, 2011, 3(5): 1729-1733.

[46]

Marek K, Radko P. Analysis of the production process in the selected company and proposal a possible model optimization through PLM software module tecnomatix plant simulation. Proc Manuf, 2014, 96: 221-226.

[47]

Chen M, Liu JF. Virtual simulation of production line for ergonomics evaluation. Adv Manuf, 2014, 2(1): 48-53.

[48]

Tang XY, Shi J, Chen LC, et al. Logistics simulation and optimization design of one production line based on Flexsim. Appl Mech Mater, 2013, 397/400: 2622-2625.

[49]

Ren CL, Yang XD, Zhang CY, et al. Modeling and optimization for energy-efficient hybrid flow-shop scheduling problem. Comput Integr Manuf Syst, 2019, 25(8): 1965-1980.

Funding

National Major Science and Technology Projects of China (CN)(No. 2019ZX04024001)

Natural Science Foundation of Beijing Municipality http://dx.doi.org/10.13039/501100004826(3192003)

Beijing Science and Technology Planning Project http://dx.doi.org/10.13039/501100012401(KM201810005013)

Tribology Science Fund of State Key Laboratory of Tribology(STLEKF16A02, SKLTKF19B08)

AI Summary AI Mindmap
PDF

185

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/