Designing a performance measurement system to support materials management in engineer-to-order: a case study

Børge Sjøbakk , Ottar Bakås , Oksana Bondarenko , Tara Kamran

Advances in Manufacturing ›› 2015, Vol. 3 ›› Issue (2) : 111 -122.

PDF
Advances in Manufacturing ›› 2015, Vol. 3 ›› Issue (2) : 111 -122. DOI: 10.1007/s40436-015-0109-2
Article

Designing a performance measurement system to support materials management in engineer-to-order: a case study

Author information +
History +
PDF

Abstract

There are many different production situations that can be employed to meet demand. In the engineer-to-order (ETO) production situation, products are manufactured to meet specific customer needs by unique engineering or significant customization. In such an environment, failing to supply the required materials in the right quantities and at the right time increases the risk of breaching due date agreements and thereby losing customer satisfaction. As such, materials management is one of the most important and critical processes within production planning and control in ETO. To bring attention and improvement to this area, ETO companies may benefit from a performance measurement system (PMS) that systematically monitors how well materials management is carried out. The design of a company’s PMS varies with its production situation. Within the large body of literature on performance management and measurement, limited literature specifically addressing performance measurement in ETO has been identified. After being approached by a Norwegian ETO company requesting a PMS for materials management, the authors therefore set out to design the PMS from scratch, using literature on ETO, materials management and performance management and measurement as a starting point. The paper presents the proposed PMS. It provides a basis for further studies on the topic, and could be used by managers in ETO companies to assess and improve their materials management practice.

Keywords

Performance measurement system (PMS) / Materials management / Engineer-to-order (ETO)

Cite this article

Download citation ▾
Børge Sjøbakk, Ottar Bakås, Oksana Bondarenko, Tara Kamran. Designing a performance measurement system to support materials management in engineer-to-order: a case study. Advances in Manufacturing, 2015, 3(2): 111-122 DOI:10.1007/s40436-015-0109-2

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Sjøbakk B, Bondarenko O, Kamran T. A performance measurement system to support materials management in engineer-to-order companies. Adv Mater Res, 2014, 1039: 569-576.

[2]

Amaro G, Hendry L, Kingsman B. Competitive advantage, customisation and a new taxonomy for non make-to-stock companies. Int J Oper Prod Manag, 1999, 19(4): 349-371.

[3]

Olhager J. Strategic positioning of the order penetration point. Int J Prod Econ, 2003, 85: 319-329.

[4]

Beckman SL, Rosenfield DB. Operations strategy, competing in the 21st century, 2008, New York: McGraw-Hill

[5]

Persona A, Regattieri A, Romano P. An integrated reference model for production planning and control in SMEs. J Manuf Technol Manag, 2004, 15(7): 626-640.

[6]

Sjøbakk B, Bakås O (2014) Designing an engineer-to-order performance measurement system: a case study. In: Advances in production management systems innovative and knowledge-based production management in a global-local world. Springer, Ajaccio, pp 473–480

[7]

Neely A, Gregory M, Platts K. Performance measurement system design: a literature review and research agenda. Int J Oper Prod Manag, 1995, 15(4): 80-116.

[8]

Bourne M, Mills J, Wilcox M, et al. Designing, implementing and updating performance measurement systems. Int J Oper Prod Manag, 2000, 20(7): 754-771.

[9]

Greenwood DJ, Levin M. Introduction to action research: social research for social change, 2007, Thousand Oaks: Sage

[10]

McKay J, Marshall P. The dual imperatives of action research. Inform Technol People, 2001, 14(1): 46-59.

[11]

Andersen B, Fagerhaug T. Performance measurement explained: designing and implementing your state-of-the-art system, 2002, Wisconsin: ASQ Quality Press

[12]

Wortmann J. Production management systems for one-of-a-kind products. Comput Ind, 1992, 19(1): 79-88.

[13]

Porter K, Little D, Peck M, et al. Manufacturing classifications: relationships with production control systems. Integr Manuf Syst, 1999, 10(4): 189-199.

[14]

Hicks C, Mcgovern T, Earl CF. A typology of UK engineer-to-order companies. Int J Logist, 2001, 4(1): 43-56.

[15]

Wacker JG, Miller M (2000) Configure-to-order planning bills of material: simplifying a complex product structure for manufacturing planning and control. Prod Invent Manag J 41(2):21–26

[16]

Wikner J, Rudberg M. Integrating production and engineering perspectives on the customer order decoupling point. Int J Oper Prod Manag, 2005, 25(7): 623-641.

[17]

Bertrand J, Muntslag D. Production control in engineer-to-order firms. Int J Prod Econ, 1993, 30: 3-22.

[18]

Hill T. Manufacturing strategy: the strategic management of the manufacturing function, 1993, London: Macmillan

[19]

Stavrulaki E, Davis M. Aligning products with supply chain processes and strategy. Int J Logist Manag, 2010, 21(1): 127-151.

[20]

Holweg M, Pil FK. Start with the customer. MIT Sloan Manag Rev, 2001, 43(1): 74-83.

[21]

Krajewski L, Wei JC, Tang LL. Responding to schedule changes in build-to-order supply chains. J Oper Manag, 2005, 23(5): 452-469.

[22]

Fredriksson P, Gadde LE. Flexibility and rigidity in customization and build-to-order production. Ind Mark Manag, 2005, 34(7): 695-705.

[23]

Gunasekaran A, Ngai EWT. Build-to-order supply chain management: a literature review and framework for development. J Oper Manag, 2005, 23(5): 423-451.

[24]

Gosling J, Naim MM (2009) Engineer-to-order supply chain management: a literature review and research agenda. Int J Prod Econ 122(2):741–754

[25]

Sjøbakk B, Thomassen MK, Alfnes E. Implications of automation in engineer-to-order production: a case study. Adv Manuf, 2014, 2(2): 1-9.

[26]

Hicks C, McGovern T, Earl C (2000) Supply chain management: a strategic issue in engineer to order manufacturing. Int J Prod Econ 65(2):179–190

[27]

McGovern T, Hicks C, Earl CF. Modelling supply chain management processes in engineer-to-order companies. Int J Logist, 1999, 2(2): 147-159.

[28]

Riley DR, Diller BE, Kerr D. Effects of delivery systems on change order size and frequency in mechanical construction. J Constr Eng Manag, 2005, 131(9): 953-962.

[29]

Caron F, Fiore A (1995) ‘Engineer to order’ companies: how to integrate manufacturing and innovative processes. Int J Proj Manag 13(5):313–319

[30]

Konijnendijk PA. Coordinating marketing and manufacturing in ETO companies. Int J Prod Econ, 1994, 37(1): 19-26.

[31]

Kingsman B, Worden L, Hendry L, et al. Integrating marketing and production planning in make-to-order companies. Int J Prod Econ, 1993, 30: 53-66.

[32]

Hicks C, Braiden P. Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach. Int J Prod Res, 2000, 38(18): 4783-4810.

[33]

Muntslag DR. Profit and risk evaluation in customer driven engineering and manufacturing. Int J Prod Econ, 1994, 36(1): 97-107.

[34]

Little D, Rollins R, Peck M, et al. Integrated planning and scheduling in the engineer-to-order sector. Int J Comput Integr Manuf, 2000, 13(6): 545-554.

[35]

Terwiesch C, Loch CH. Managing the process of engineering change orders: the case of the climate control system in automobile development. J Prod Innov Manag, 1999, 16(2): 160-172.

[36]

Danese P, Romano P (2004) Improving inter-functional coordination to face high product variety and frequent modifications. Int J Oper Prod Manag 24(9–10):863–885

[37]

Pandit A, Zhu Y (2007) An ontology-based approach to support decision-making for the design of ETO (Engineer-to-Order) products. Autom Constr 16(6):759–770

[38]

Parthiban P, Goh M. An integrated model for performance management of manufacturing units. Benchmarking Int J, 2011, 18(2): 261-281.

[39]

de Leeuw S, van den Berg JP. Improving operational performance by influencing shopfloor behavior via performance management practices. J Oper Manag, 2011, 29(3): 224-235.

[40]

Fortuin L (1988) Performance indicators: why, where and how? Eur J Oper Res 34(1):1–9

[41]

Behn RD. Why measure performance? Different purposes require different measures. Public Adm Rev, 2003, 63(5): 586-606.

[42]

Kaplan RS, Norton DP. Using the balanced scorecard as a strategic management system. Harv Bus Rev, 1996, 74(1): 75-85.

[43]

Stephens S (2001) The supply chain council and the supply chain operations reference model. Supply Chain Manag 1:9–13

[44]

Browne J, Devlin J, Rolstadas A, et al. Performance measurement: the ENAPS approach. Int J Bus Transform, 1997, 1: 73-84.

[45]

Plemmons JK, Bell LC. Measuring effectiveness of materials management process. J Manag Eng, 1995, 11(6): 26-32.

[46]

Beatham S, Anumba C, Thorpe T, et al. KPIs: a critical appraisal of their use in construction. Benchmarking Int J, 2004, 11(1): 93-117.

[47]

Chan AP, Chan AP. Key performance indicators for measuring construction success. Benchmarking Int J, 2004, 11(2): 203-221.

[48]

Takim R, Akintoye A (2002) Performance indicators for successful construction project performance, In: The 18th annual ARCOM conference, Northumbria, UK, pp 545–555

[49]

Robinson HS, Carrillo PM, Anumba CJ, et al. Review and implementation of performance management models in construction engineering organizations. Constr Innov Inf Process Manag, 2005, 5(4): 203-217.

[50]

Navon R. Research in automated measurement of project performance indicators. Autom Constr, 2007, 16(2): 176-188.

[51]

Gunasekaran A, Patel C, Tirtiroglu E (2001) Performance measures and metrics in a supply chain environment. Int J Oper Prod Manag 21(1–2):71–87

[52]

Chae BK. Developing key performance indicators for supply chain: an industry perspective. Supply Chain Manag Int J, 2009, 14(6): 422-428.

[53]

Beamon BM. Measuring supply chain performance. Int J Oper Prod Manag, 1999, 19(3): 275-292.

[54]

Gunasekaran A, Kobu B. Performance measures and metrics in logistics and supply chain management: a review of recent literature (1995–2004) for research and applications. Int J Prod Res, 2007, 45(12): 2819-2840.

[55]

Gaur V, Fisher ML, Raman A. An econometric analysis of inventory turnover performance in retail services. Manag Sci, 2005, 51(2): 181-194.

[56]

Parmenter D. Key performance indicators (KPI): developing, implementing, and using winning KPIs, 2010, Hoboken: Wiley

AI Summary AI Mindmap
PDF

186

Accesses

0

Citation

Detail

Sections
Recommended

AI思维导图

/