Modernization of the Irkutsk Refrigeration Plant
I. G. Machkov
Refrigeration Technology ›› 2003, Vol. 92 ›› Issue (8) : 42 -44.
Modernization of the Irkutsk Refrigeration Plant
The Irkutsk Cold Storage Plant was put into operation in 1958. (the ice cream factory went into operation in 1960), has a total conditional capacity of 19645 tons, including the capacity of negative temperature chambers of 11739 tons. The ice-cream factory performs operations of acceptance, storage and shipment of goods, rents out refrigerated chambers, and produces ice cream. The refrigeration plant was reconstructed between 1993 and 1996, but was not completed. In 2002 with the coming of the new owner reconstruction and modernization of the ammonia refrigerating plant (ACP) according to the project of Odessa Institute of Low Temperature Equipment and Energy (1995) was resumed.