Determination of the Orbit of Chang’E-4 Relay Satellite Under Sparse Observation

LIU Siyu1,3, HUANG Yong1,2, LI Peijia1, YANG Peng1,2

PDF(2151 KB)
PDF(2151 KB)
Journal of Deep Space Exploration ›› 2022, Vol. 9 ›› Issue (1) : 14-20. DOI: 10.15982/j.issn.2096-9287.2022.20210071
Special Issue:Technology and Application of Deep Space Exploration
Special Issue:Technology and Application of Deep Space Exploration

Determination of the Orbit of Chang’E-4 Relay Satellite Under Sparse Observation

  • LIU Siyu1,3, HUANG Yong1,2, LI Peijia1, YANG Peng1,2
Author information +
History +

Abstract

Chang’E-4 relay satellite successfully entered the Earth-Moon L2 Halo orbit on June 14, 2018, and assumed the data transmission function between the ground-based measurement and control station and Chang’E-4 lander. At present, Chang’E-4 relay satellite is in sparse observation mode, with an average of 4~5 days for each observation. This paper analyzes the orbit determination accuracy of Chang’E-4 relay satellite circling the Earth-Moon L2 in January 2021. The orbit accuracy of the relay satellite around the L2 point is better than 2km, and the arc including the VLBI delay and delay rate reaches the level of 100 meters. Under the premise of VLBI observation, reasonable allocation of the coverage period of the ranging and velocity measurement arcs can effectively improve the orbit accuracy under the same data coverage.

Keywords

Chang’E-4 relay satellite / Earth-Moon L2 point / orbit determination / sparse observation

Cite this article

Download citation ▾
LIU Siyu, HUANG Yong, LI Peijia, YANG Peng. Determination of the Orbit of Chang’E-4 Relay Satellite Under Sparse Observation. Journal of Deep Space Exploration, 2022, 9(1): 14‒20 https://doi.org/10.15982/j.issn.2096-9287.2022.20210071

References

[1] 吴伟仁,王琼,唐玉华,等. “嫦娥4号”月球背面软着陆任务设计[J]. 深空探测学报(中英文),2017,4(2):111-117
WU W R,WANG Q,TANG Y H,et al. Design of Chang’e-4 lunar farside soft-landing mission[J]. Journal of Deep Space Exploration,2017,4(2):111-117
[2] 何芸,刘祺,田伟,等. 地月第二拉格朗日点卫星激光测距技术研究[J]. 深空探测学报(中英文),2017,4(2):130-137
HE Y,LIU Q,TIAN W,et al. Study on laser ranging for satellite on the second lagrange point of Earth-Moon system[J]. Journal of Deep Space Exploration,2017,4(2):130-137
[3] 李春来,刘建军,左维,等. 中国月球探测进展(2011-2020年)[J]. 空间科学学报,2021,41(1):68-75.
LI C L,LIU J J,ZUO W,et al. Progress of China’s lunar exploration(2011-2020)[J]. Chinese Journal of Space Science, 2021,41(1):68-75.
[4] QIN S H,HUANG Y,LI P J. Orbit and tracking data evaluation of Chang’E-4 relay satellite[J]. Advances in Space Research,2019,64:836-846
[5] 刘林,胡松杰,王歆. 航天动力学引论[M]. 南京:南京大学出版社,2006.
LIU L,HU S J,WANG X. An introduction of astrodynamics[M]. Nanjing:Nanjing University Press,2006.
[6] WOODARD M,COSGROVE D,MORINELLI P,et al. Orbit determination of spacecraft in Earth-Moon L1 and L2 libration point orbits[C]//Proceedings of AAS/AIAA Astrodynamics Specialist Conference. Girdwood:AAS/AIAA,2011.
[7] 曹建峰,胡松杰,黄勇,等. 嫦娥二号卫星日地拉格朗日L2点探测轨道定轨分析[J]. 武汉大学学报(信息科学版),2013,38(9):1029-1033
CAO J F,HU S J,HUANG Y,et al. Orbit determination and analysis for Chang’E-2 extended mission[J]. Geomatics and Information Science of Wuhan University,2013,38(9):1029-1033
[8] 黄勇,李培佳,樊敏,等. 基于地基测量数据的地月L2点探测器轨道确定[J]. 中国科学:物理学 力学 天文学,2018,48(7):107-114
HUANG Y. LI P J,FAN M,et al. Orbit determination of CE-5T1 in Earth-Moon L2 libration point orbit with ground tracking data[J]. SCIENTIA SINICA Physica,Mechanica & Astronomica,2018,48(7):107-114
[9] 曾豪,李朝玉,彭坤,等. 地月空间NRHO与DRO在月球探测中的应用研究[J]. 宇航学报,2020,41(7):910-919
ZENG H. LI Z Y. PENG K,et al. Research on application of Earth-Moon NRHO and DRO for lunar exploration[J]. Journal of Astronautics,2020,41(7):910-919
[10] 武宇翔,温卫斌,平劲松,等. 利用Halo轨道仿真开展嫦娥四号中继星与月面设备干涉基线的研究[J]. 天文研究与技术,2021,18(1):69-76
WU Y X,WEN W B,PING J S,et al. Research of interferometry baselines between CE-4 rover and lunar facility using Halo orbit simulation[J]. Astronomical Research & Technology,2021,18(1):69-76
[11] 段建锋,李勰,李翠兰,等. “嫦娥4号”中继星使命轨道段定轨计算与分析[J]. 深空探测学报(中英文),2019,6(3):247-253
DUAN J F,LI X,LI C L,et al. Orbit determination and analysis of Chang’E-4 relay satellite on mission orbit[J]. Journal of Deep Space Exploration,2019,6(3):247-253
[12] 钱霙婧,荆武兴,刘玥,等. 地月平动点拟周期轨道设计方法[J]. 系统工程与电子技术,2014,36(8):1586-1594
QIAN Y J,JING W X,LIU Y,et al. Design of quasi-periodic orbit about the translunar libration point[J]. Systems Engineering and Electronics,2014,36(8):1586-1594
[13] 马传令,刘勇,陈明,等. CE-4中继卫星使命轨道维持与动量轮卸载联合控制方法[J]. 宇航学报,2020,41(4):389-397
MA C L,LIU Y,CHEN M,et al. A Combined control method of Chang’e-4 relay satellite’s mission orbit-keeping maneuver and momentum wheel unloading[J]. Journal of Astronautics,2020,41(4):389-397
[14] 洪晓瑜,张秀忠,郑为民,等. VLBI技术研究进展及在中国探月工程的应用[J]. 深空探测学报(中英文),2020,7(4):321-331
HONG X Y, ZHANG X Z, ZHENG W M. Research progress of VLBI technology and application to China lunar exploration project[J]. Journal of Deep Space Exploration,2020,7(4):321-331
PDF(2151 KB)

Accesses

Citations

Detail

Sections
Recommended

/