Adaptability evolution of financing systems of mega projects
Xue YAN, Longmiao GAO, Huimin LIU
Adaptability evolution of financing systems of mega projects
Mega projects require large funding, which often reaches tens or even hundreds of billions of yuan. In the state-oriented financing system, the huge fund gap has generally become an important factor restricting the development of mega projects worldwide. Since the 1980s, China’s long-span bridge projects have developed rapidly as typical mega projects as their financing systems have also undergone a series of changes and shown a high adaptability to complexity. However, the existing literature based on the perspective of evolution lacks focus on the complexity of mega project financing systems and its causes. Therefore, the complexity of the financing methods employed in the financing systems for China’s long-span bridges is analyzed in this work from the dimensions of time and regions through investigation and interviews. On the basis of the results and complex adaptive systems theory, the causes of the complexity are further explored in terms of the clustering effects of financing subjects and the deep uncertainty of financing environments. Then, the evolution rules of financing systems of mega projects are established from the aspect of financing subjects, financing environments, and financing methods. The research results can enrich decision-makers’ understanding of the essential attributes and formation mechanism of the financing systems of mega projects and provide powerful support for decision-making in financing.
adaptability evolution / financing methods / long-span bridges in China / mega projects
[1] |
Auyang S Y (1998). Foundations of Complex-System Theories: In Economics, Evolutionary Biology, and Statistical Physics. Cambridge: Cambridge University Press
|
[2] |
Berggren C, Järkvik J, Söderlund J (2008). Lagomizing, organic integration, and systems emergency wards: Innovative practices in managing complex systems development projects. Project Management Journal, 39(1_suppl): S111–S122
CrossRef
Google scholar
|
[3] |
Bosch O J (2011). Maternal nurturing is dependent on her innate anxiety: The behavioral roles of brain oxytocin and vasopressin. Hormones and Behavior, 59(2): 202–212
CrossRef
Pubmed
Google scholar
|
[4] |
Brealey R A, Cooper I A, Habib M A (1996). Using project finance to fund infrastructure investments. Journal of Applied Corporate Finance, 9(3): 25–39
CrossRef
Google scholar
|
[5] |
Chan A P, Osei-Kyei R, Hu Y, Yun L E (2018). A fuzzy model for assessing the risk exposure of procuring infrastructure mega-projects through public-private partnership: The case of Hong Kong–Zhuhai–Macao Bridge. Frontiers of Engineering Management, 5(1): 64–77
CrossRef
Google scholar
|
[6] |
Chen C (2009). Can the pilot BOT Project provide a template for future projects? A case study of the Chengdu No. 6 Water Plant B Project. International Journal of Project Management, 27(6): 573–583
CrossRef
Google scholar
|
[7] |
Choi T Y, Dooley K J, Rungtusanatham M (2001). Supply networks and complex adaptive systems: Control versus emergence. Journal of Operations Management, 19(3): 351–366
CrossRef
Google scholar
|
[8] |
Combs J G, Michael S C, Castrogiovanni G J (2004). Franchising: A review and avenues to greater theoretical diversity. Journal of Management, 30(6): 907–931
CrossRef
Google scholar
|
[9] |
Dias Jr A, Ioannou P G (1995). Debt capacity and optimal capital structure for privately financed infrastructure projects. Journal of Construction Engineering and Management, 121(4): 404–414
CrossRef
Google scholar
|
[10] |
Feltenstein A, Farhadian Z (1987). Fiscal policy, monetary targets, and the price level in a centrally planned economy: An application to the case of China. Journal of Money, Credit and Banking, 19(2): 137–156
CrossRef
Google scholar
|
[11] |
Fleming L, Sorenson O (2001). Technology as a complex adaptive system: Evidence from patent data. Research Policy, 30(7): 1019–1039
CrossRef
Google scholar
|
[12] |
Flyvbjerg B (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2): 6–19
CrossRef
Google scholar
|
[13] |
Geraldi J G, Adlbrecht G (2007). On faith, fact, and interaction in projects. Project Management Journal, 38(1): 32–43
CrossRef
Google scholar
|
[14] |
Hämäläinen R, Kettunen E, Marttunen M, Ehtamo H (2001). Evaluating a framework for multi-stakeholder decision support in water resources management. Group Decision and Negotiation, 10(4): 331–353
CrossRef
Google scholar
|
[15] |
Henisz W J (2002). The institutional environment for infrastructure investment. Industrial and Corporate Change, 11(2): 355–389
CrossRef
Google scholar
|
[16] |
Holland J H (1992). Complex adaptive systems. Daedalus, 121(1): 17–30
|
[17] |
Innes J E, Booher D E (1999). Consensus building and complex adaptive systems. Journal of the American Planning Association, 65(4): 412–423
CrossRef
Google scholar
|
[18] |
Janssen M A, Walker B H, Langridge J, Abel N(1999). An adaptive agent model for analysing co-evolution of management and policies in a complex rangeland system. Ecological Modelling, 131(2): 249–268
|
[19] |
Jayanthi S, Sinha K K (1998). Innovation implementation in high technology manufacturing: A chaos-theoretic empirical analysis. Journal of Operations Management, 16(4): 471–494
CrossRef
Google scholar
|
[20] |
Jia G, Yang F, Wang G, Hong B, You R (2011). A study of mega project from a perspective of social conflict theory. International Journal of Project Management, 29(7): 817–827
CrossRef
Google scholar
|
[21] |
Kauffman S (1996). At Home in the Universe: The Search for the Laws of Self-Organization and Complexity. Oxford: Oxford University Press
|
[22] |
Keshavarz N, Nutbeam D, Rowling L, Khavarpour F (2010). Schools as social complex adaptive systems: A new way to understand the challenges of introducing the health promoting schools concept. Social Science & Medicine, 70(10): 1467–1474
CrossRef
Pubmed
Google scholar
|
[23] |
Klerkx L, Aarts N, Leeuwis C (2010). Adaptive management in agricultural innovation systems: The interactions between innovation networks and their environment. Agricultural Systems, 103(6): 390–400
CrossRef
Google scholar
|
[24] |
Kujala J, Brady T, Putila J (2014). Challenges of cost management in complex projects. International Journal of Business and Management, 9(11): 48–58
CrossRef
Google scholar
|
[25] |
Lansing J S (2003). Complex adaptive systems. Annual Review of Anthropology, 32(1): 183–204
CrossRef
Google scholar
|
[26] |
Li C W, Ma S Y, Ren Y, Zhang P N, Li X (2016). Research on financing method of public charging facilities based on cooperative game. In: 2016 the International Conference on Logistics, Informatics and Service Sciences (LISS). IEEE, 1–6
|
[27] |
Li Y, Lu Y, Ma L, Kwak Y H (2018). Evolutionary governance for Mega-Event Projects (MEPs): A case study of the World Expo 2010 in China. Project Management Journal, 49(1): 57–78
CrossRef
Google scholar
|
[28] |
Lo A W, Naraharisetti S V (2013). New financing methods in the biopharma industry: A case study of Royalty Pharma, Inc. Journal of Investment Management, 12: 4–19
|
[29] |
Mauboussin M J (2002). Revisiting market efficiency: The stock market as a complex adaptive system. Journal of Applied Corporate Finance, 14(4): 47–55
CrossRef
Google scholar
|
[30] |
Morris P W G (2013). Reconstructing project management reprised: A knowledge perspective. Project Management Journal, 44(5): 6–23
CrossRef
Google scholar
|
[31] |
Müller R, Geraldi J, Turner J R (2012). Relationships between leadership and success in different types of project complexities. IEEE Transactions on Engineering Management, 59(1): 77–90
CrossRef
Google scholar
|
[32] |
Osei-Kyei R, Chan A P C (2015). Review of studies on the critical success factors for Public–Private Partnership (PPP) projects from 1990 to 2013. International Journal of Project Management, 33(6): 1335–1346
CrossRef
Google scholar
|
[33] |
Pathak S D, Day J M, Nair A, Sawaya W J, Kristal M M (2007). Complexity and adaptivity in supply networks: Building supply network theory using a complex adaptive systems perspective. Decision Sciences, 38(4): 547–580
CrossRef
Google scholar
|
[34] |
Pitsis A, Clegg S, Freeder D, Sankaran S, Burdon S (2018). Megaprojects redefined—Complexity vs cost and social imperatives. International Journal of Managing Projects in Business, 11(1): 7–34
CrossRef
Google scholar
|
[35] |
Railsback S F (2001). Concepts from complex adaptive systems as a framework for individual-based modelling. Ecological Modelling, 139(1): 47–62
CrossRef
Google scholar
|
[36] |
Rijke J, van Herk S, Zevenbergen C, Ashley R, Hertogh M, ten Heuvelhof E (2014). Adaptive programme management through a balanced performance/strategy oriented focus. International Journal of Project Management, 32(7): 1197–1209
CrossRef
Google scholar
|
[37] |
Schneider M, Somers M (2006). Organizations as complex adaptive systems: Implications of complexity theory for leadership research. Leadership Quarterly, 17(4): 351–365
CrossRef
Google scholar
|
[38] |
Shen L, Li H, Li Q (2002). Alternative concession model for build operate transfer contract projects. Journal of Construction Engineering and Management, 128(4): 326–330
CrossRef
Google scholar
|
[39] |
Sheng Z H (2017). Fundamental Theories of Mega Infrastructure Construction Management: Theoretical Considerations from Chinese Practices. Berlin: Springer
|
[40] |
Sheng Z H, Lin H (2018). From systematicness to complexity: Fundamental thinking of mega-project management. Frontiers of Engineering Management, 5(1): 125–127
CrossRef
Google scholar
|
[41] |
Song K, An K, Yang G, Huang J (2012). Risk-return relationship in a complex adaptive system. PLoS One, 7(3): e33588
CrossRef
Pubmed
Google scholar
|
[42] |
Teller J, Unger B N, Kock A, Gemünden H G (2012). Formalization of project portfolio management: The moderating role of project portfolio complexity. International Journal of Project Management, 30(5): 596–607
CrossRef
Google scholar
|
[43] |
Walker W T (2004). Supply Chain Architecture: A Blueprint for Networking the Flow of Material, Information, and Cash. Boca Raton, Florida: CRC Press
|
[44] |
Wang D, Zhang L, Zhang Z, Zhao S X (2011). Urban infrastructure financing in reform-era China. Urban Studies, 48(14): 2975–2998
CrossRef
Google scholar
|
[45] |
Wang T, Yang X (2008). Decision model for infrastructure project financing based on interval entropy. In: 2008 International Conference on MultiMedia and Information Technology. IEEE, 180–183
|
[46] |
Wu W (2010). Urban infrastructure financing and economic performance in China. Urban Geography, 31(5): 648–667
CrossRef
Google scholar
|
[47] |
Wu W H, Wang J (2011). China railway construction project financing model. In: 2011 International Conference on E-Business and E-Government. IEEE, 1–5
|
[48] |
Yan X, Chong H Y, Sheng Z, Wang X Y (2017). Financing decision model for toll roads: Balancing economic and public attributes. Journal of Management Engineering, 33(4): 04017010
CrossRef
Google scholar
|
[49] |
Zeng M, Liu X M, Li Y L, Peng L L (2014). Review of renewable energy investment and financing in China: Status, mode, issues and countermeasures. Renewable and Sustainable Energy Reviews, 31: 23–37
CrossRef
Google scholar
|
[50] |
Zhang B Z, Guo H D, Yang C X, Wang L (2016). Research on evaluating the efficiency of the project financing of the energy service company. Frontiers of Engineering Management, 3(3): 252–257
CrossRef
Google scholar
|
[51] |
Zhou H, Zhang S, Zhang W, Wang F, Zhong Y, Gu L, Qu Z, Tian D (2015). Evaluation and mechanism for outcomes exploration of providing public health care in contract service in Rural China: A multiple-case study with complex adaptive systems design. BMC Public Health, 15(1): 199
CrossRef
Pubmed
Google scholar
|
/
〈 | 〉 |