Remanufacturing in China is still in its early stage and faces pressures from society, policy, technology and management. Considering the current state of remanufacturing in China, this paper researched several key management issues involving various aspects from the perspective of remanufacturing players. Based on a needs analysis on the trend of remanufacturing development in China, the following six key management problems were researched; risk management of remanufacturing players, remanufacturing production management, remanufacturing quality management, authentication mode of remanufacturing in China, subsidy policy of remanufacturing industry, and performance assessment of remanufacturing. The characteristics of issues were analyzed and the corresponding countermeasures were put forward.
| [1] |
Chen, W., Ma, S., & Yao, X.2009. Integrated assessment study on circular economy of China. Beijing: China Economic Publishing House
|
| [2] |
Chen, X., Liang, G., & Ma, S.2007. Continuous quality improvement for remanufacturing products based on PMLC. China Mechanical Engineering, 18, 170–174
|
| [3] |
Cheng, H., & Su, C.2008. Overview of production planning and scheduling research oriented to remanufacturing system. Manufacture Information Engineering of China, 13, 13–16
|
| [4] |
Da, Q., Huang, Z., & Zhang, Q.2004. Current and future studies on structure of the reverse logistics system: a review. Chinese Journal of Management Science, 12, 131–138
|
| [5] |
Guide, V.D. Jr. 2000. Production planning and control for remanufacturing: industry practice and research needs. Journal of Operations Management, 18, 467–483
|
| [6] |
Guide, V.D. Jr, Jayaraman, V., & Srivastava, R.1999. Production planning and control for remanufacturing: a state-of-the-art survey. Robotics and Computer-integrated Manufacturing, 15, 221–230
|
| [7] |
Liu, B., Xu, B., & Shi, P.2010. A design for integrated assessment indexing system of remanufacturing. Journal of Inspection and Quarantine, 20, 53–56
|
| [8] |
Nasr, N., Hughson, C., Varel, E., & Bauer, R.1998. State-of-the-art assessment of remanufacturing technology. Rochester, NY: Rochester Institute of Technology
|
| [9] |
Teunter, R., & Van der Laan, E.2002. On the non-optimality of the average cost approach for inventory models with remanufacturing. International Journal of Production Economics, 79, 67–73
|
| [10] |
Van der Laan, E., Dekker, R., Salomon, M., & Ridder, A.1996. An inventory model with remanufacturing and disposal. International Journal of Production Economics, 46–47, 339–350
|
| [11] |
Xu, B.2007. Remanufacture and recycling economy. Beijing: Science Press, 41–42
|
| [12] |
Xu, B.2008. Technical foundation and new research development of remanufacturing engineering. Digital Manufacture Science, 6, 1–18
|
| [13] |
Xu, B.2009. Remanufacturing of construction machinery and its key technologies. Construction Machinery and Equipment, 40, 1–6
|
| [14] |
Xu, B.2010. Remanufacture engineering and its development in China. China Surface Engineering, 23, 1–6
|
| [15] |
Zhu, S., & Yao, J.2009. Theory and application of remanufacturing design. Beijing: China Machine Press, 134–136
|
RIGHTS & PERMISSIONS
Higher Education Press and Springer-Verlag Berlin Heidelberg