Performance of seven highway construction contracting methods analyzed by project size
Yuanxin ZHANG, Abdol CHINI, R. Edward MINCHIN Jr., Lourdes PTSCHELINZEW, Dev SHAH
Performance of seven highway construction contracting methods analyzed by project size
The conventional Design-Bid-Build (DBB) construction contracting method has had various drawbacks exposed in highway construction practice, including lack of communication, inefficient design, antagonizing relationships, and increased disputes. To mitigate the negative aspects of DBB, several alternative contracting methods and alternative project delivery systems have been devised and introduced to the industry over the past 30 years. Five such innovations were tested by a research team from the University of Florida under the sponsorship of the Florida Department of Transportation (FDOT). To perform a realistic assessment, this study categorized FDOT projects built between 2006 and 2015 into groups according to current contract amounts. Both absolute and relative metrics were defined and employed. For comparison purposes, a collective analysis on all gathered data was performed. Additionally, the influence of outliers on the results was examined. The results showed that analyses based on individual cost categories are more convincing because large projects tend to impose stronger influence on the analyses. In addition, outliers must be identified and screened to reach realistic and reliable conclusions. With regard to the actual performance of the contracting methods, each performs differently within different cost categories.
alternative contracting methods / time / cost / performance evaluation
[1] |
Anderson S D, Damnjanovic I D (2008). Selection and evaluation of alternative contracting methods to accelerate project completion. NCHRP Synthesis 379, Transportation Research Board, Washington, D.C., 77
|
[2] |
Beard J, Loulakis E M, Wundram E (2001). Design-Build: Planning through Development. New York: McGraw Hill Professional
|
[3] |
Charoenphol D, Stuban S M, Dever J R (2016). Using robust statistical methodology to evaluate the cost performance of project delivery systems: A case study of horizontal construction. Journal of Cost Analysis and Parametrics, 9(3): 181–200
CrossRef
Google scholar
|
[4] |
Chen Q, Jin Z, Xia B, Wu P, Skitmore M (2016). Time and cost performance of design–build projects. Journal of Construction Engineering and Management, 142(2): 04015074
CrossRef
Google scholar
|
[5] |
Choi K, Kwak Y H, Pyeon J H, Son K (2012). Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects. Journal of Construction Engineering and Management, 138(3): 323–330
CrossRef
Google scholar
|
[6] |
Col Debella D, Ries R (2006). Construction delivery systems: A comparative analysis of their performance within school districts. Journal of Construction Engineering and Management, 132(11): 1131–1138
CrossRef
Google scholar
|
[7] |
El Asmar M, Hanna A S, Loh W Y (2013). Quantifying performance for the integrated project delivery system as compared to established delivery systems. Journal of Construction Engineering and Management, 139(11): 04013012
CrossRef
Google scholar
|
[8] |
Ellis R D, Herbsman Z J, Kumar A (1991). Evaluation of the FDOT design/build program. Florida Department of Transportation
|
[9] |
Ellis R D, Pyeon J H, Herbsman Z J,
|
[10] |
FDOT (2017). Design-Build Minor. http://www.fdot.gov/construction/AltContract/General/DBMinor.shtm
|
[11] |
FDOT (2017). Design-Building Major. http://www.fdot.gov/construction/AltContract/General/DBMajor.shtm
|
[12] |
Gordon C (1994). Choosing appropriate construction contracting method. Journal of Construction Engineering and Management, 120(1): 196–210
CrossRef
Google scholar
|
[13] |
Herbsman Z, Ellis R (1992). Multiparameter bidding system-innovation in contract administration. Journal of Construction Engineering and Management, 118(1): 142–150
CrossRef
Google scholar
|
[14] |
Herbsman Z J, Chen W T, Epstein W C (1995). Time is money: Innovative contracting methods in highway construction. Journal of Construction Engineering and Management, 121(3): 273–281
CrossRef
Google scholar
|
[15] |
Ibbs C W, Kwak Y H, Ng T, Odabasi A M (2003). Project delivery systems and project change: Quantitative analysis. Journal of Construction Engineering and Management, 129(4): 382–387
CrossRef
Google scholar
|
[16] |
Konchar M, Sanvido V (1998). Comparison of US project delivery systems. Journal of Construction Engineering and Management, 124(6): 435–444
CrossRef
Google scholar
|
[17] |
Meng X, Gallagher B (2012). The impact of incentive mechanisms on project performance. International Journal of Project Management, 30(3): 352–362
CrossRef
Google scholar
|
[18] |
Miller J B (1995). Aligning infrastructure development strategy to meet current needs. Dissertation for the Doctoral Degree. Boston: Massachusetts Institute of Technology
|
[19] |
Minchin R E, Chini A R, Ptschelinzew L,
|
[20] |
Minchin R E Jr, Li X, Issa R R, Vargas G G (2013). Comparison of cost and time performance of design-build and design-bid-build delivery systems in Florida. Journal of Construction Engineering and Management, 139(10): 04013007
CrossRef
Google scholar
|
[21] |
Molenaar K, Harper C, Yugar-Arias I (2014). Guidebook for Selecting Alternative Contracting Methods for Roadway Projects: Project Delivery Methods, Procurement Procedures and Payment Provisions.
|
[22] |
Molenaar K R, Songer A D, Barash M (1999). Public-sector design/build evolution and performance. Journal of Management Engineering, 15(2): 54–62
CrossRef
Google scholar
|
[23] |
Molenaar K R, Yakowenko G (2007). Alternative project delivery, procurement, and contracting methods for highways. American Society of Civil Engineers Reston, Virginia
|
[24] |
Shrestha P P, O’Connor J T, Gibson G E Jr (2011). Performance comparison of large design-build and design-bid-build highway projects. Journal of Construction Engineering and Management, 138(1): 1–13
CrossRef
Google scholar
|
[25] |
Strong K, Tometich C, Raadt N (2005). Cost effectiveness of design-build, lane rental, and A+B contracting techniques. In: Proceeding of Mid-Continent Transportation Research Symposium Ames, IA
|
[26] |
Tran D, Harper C, Molenaar K, Haddad N, Scholfield M (2013). Project delivery selection matrix for highway design and construction. Transportation Research Record: Journal of the Transportation Research Board, 2347: 3–10
CrossRef
Google scholar
|
/
〈 | 〉 |