The Research of Business Process Management-based on The Changqing Oil Field Cooperation Project

Ning Hui , Xiao-wei Zhou , Qing-qing Chang

Front. Eng ›› 2015, Vol. 2 ›› Issue (2) : 182 -187.

PDF (78KB)
Front. Eng ›› 2015, Vol. 2 ›› Issue (2) :182 -187. DOI: 10.15302/J-FEM-2015027
ENGINEERING MANAGEMENT REPORTS
ENGINEERING MANAGEMENT REPORTS
The Research of Business Process Management-based on The Changqing Oil Field Cooperation Project
Author information +
History +
PDF (78KB)

Abstract

This paper elaborates on defects in the PetrolChina Changqing Oilfield Cooperation Management Project in an attempt to improve future cooperative efforts. The paper focuses on the drawbacks in the existing management process and analyzes the process by using current information management methods. This effort is made in hopes of arriving at the most efficient and effective method to redesign the existing processes.

Keywords

cooperation project / process optimization / management / improvement

Cite this article

Download citation ▾
Ning Hui, Xiao-wei Zhou, Qing-qing Chang. The Research of Business Process Management-based on The Changqing Oil Field Cooperation Project. Front. Eng, 2015, 2(2): 182-187 DOI:10.15302/J-FEM-2015027

登录浏览全文

4963

注册一个新账户 忘记密码

References

[1]

Chu, Y., & Wang, S. (2012). How to implement process optimization. Liaoning Industrial University Journal2, 14–15

[2]

Hamer, M. (1990). Reengineering work: don’t automate, obliterate. Harvard Business Review68, 104–112

[3]

Hui, N.Feng, A., & Hu, X. (2012). The symposium of oil gas cooperation development and trend. West Development6, 22

[4]

Hui, N., & Yao, H. (2009). The sustainable development of resource-oriented organization. Technology Progress and Strategy8, 79–80

[5]

Li, G. (2014). The ten steps of organization process management. Organization Management8, 96–99

[6]

Lin, Y. (2011). The application research of process management module in the small to medium entities. (Unpublished doctoral dissertation). Hangzhou: Zhejiang Engineering University

[7]

Liu, S.Zhao, Q., & Liu, N. (2012). The research of process optimization on process point. Small to Medium Organization Management and Technology1, 40–41

[8]

Tang, J.Hui, N., & Yao, H. (2010). The innovative management and development of low grade oil deposit. Technology Progress and Strategy19, 134–138

[9]

Wang, X.Lan, X., & Yu, T. (2006). Process optimization application. Hebei Industrial Technology3, 95–98

RIGHTS & PERMISSIONS

Higher Education Press and Springer-Verlag Berlin Heidelberg

PDF (78KB)

4344

Accesses

0

Citation

Detail

Sections
Recommended

/