PDF
(1580KB)
Abstract
Through analysis of articles published from 2000 to March 2014 in Automaton in Construction (AUTCON), an international research journal published by Elsevier, this paper summarizes the topics of research and the institutions worldwide where research was conducted in construction safety engineering and management. Seventy-one articles published during this time focused on Information Technology (IT) applications in this field were selected for analysis. The underlying research topics and their related IT implementations are discussed, and research trends in allied specialties are identified.
Keywords
industrial safety engineering and management
/
construction technology
/
building engineering
/
information technology
/
automation
/
international research journal
/
research trends
Cite this article
Download citation ▾
Mirosław J. Skibniewski.
Research Trends in Information Technology Applications in Construction Safety Engineering and Management.
Front. Eng, 2014, 1(3): 246-259 DOI:10.15302/J-FEM-2014034
| [1] |
Abderrahim, M., (2005). A mechatronics security system for the construction site. Automation in Construction, 14(4), 460-466.
|
| [2] |
Bosche, F., & Haas, C.T. (2008). Automated retrieval of 3D CAD model objects in construction range images. Automation in Construction, 17(4), 499-512.
|
| [3] |
Carbonari, A., Giretti, A., & Naticchia, B. (2011). A proactive system for real-time safety management in construction sites. Automation in Construction, 20(6), 686-698.
|
| [4] |
Chae, S., & Yoshida, T. (2010). Application of RFID technology to prevention of collision accident with heavy equipment. Automation in Construction, 19(3), 368-374.
|
| [5] |
Cheng, T., (2011). Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments. Automation in Construction, 20(8), 1173-1184.
|
| [6] |
Cheng, T., & Teizer, J. (2014). Modeling tower crane operator visibility to minimize the risk of limited situational awareness. Journal of Computing in Civil Engineering, 28(3).
|
| [7] |
Chu, B., (2013). Robot-based construction automation: An application to steel beam assembly (Part I). Automation in Construction, 32, 46-61.
|
| [8] |
Cinkelj, J., (2010). Closed-loop control of hydraulic telescopic handler. Automation in Construction, 19(7), 954-963.
|
| [9] |
Costin, A., Pradhananga, N., & Teizer, J. (2012). Leveraging passive RFID technology for construction resource field mobility and status monitoring in a high-rise renovation project. Automation in Construction, 24, 1-15.
|
| [10] |
Ding, L. Y., (2013). Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the internet of things. Automation in Construction, 36, 25-37.
|
| [11] |
Ding, L. Y., & Li, H. (2013). Information technologies in safety management of large-scale infrastructure projects. Automation in Construction, 34, 1-2.
|
| [12] |
Ding, L. Y., (2012). Safety risk identification system for metro construction on the basis of construction drawings. Automation in Construction, 27, 120-137.
|
| [13] |
Ding, L. Y., & Zhou, C. (2013). Development of web-based system for safety risk early warning in urban metro construction. Automation in Construction, 34, 45-55.
|
| [14] |
Dolinsek, B., & Duhovnik, J. (1998). Robotic assembly of rebar cages for beams and columns. Automation in Construction, 8(2), 195-207.
|
| [15] |
Du, J. C., & Teng, H. C. (2007). 3D laser scanning and GPS technology for landslide earthwork volume estimation. Automation in Construction, 16(5), 657-663.
|
| [16] |
Dzeng, R. J., Fang, Y. C., & Chen, I. C. (2014). A feasibility study of using smartphone built-in accelerometers to detect fall portents. Automation in Construction, 38(0), 74-86.
|
| [17] |
Golparvar-Fard, M., (2011). Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques. Automation in Construction, 20(8), 1143-1155.
|
| [18] |
Han, C. S., (2006). A multidegree-of-freedom manipulator for curtain-wall installation. Journal of Field Robotics, 23(5), 347-360.
|
| [19] |
Hussien, B., & McLaren, R. W. (1992). Obstacle avoidance in path planning using intersection constraint search. Automation in Construction, 1(3), 285-295.
|
| [20] |
Hussien, B., & McLaren, R. W. (1993). Real-time robot path planning using the potential function method. Automation in Construction, 2(3), 241-250.
|
| [21] |
Hu, Z. Z., & Zhang, J. P. (2011). BIM- and 4D-based integrated solution of analysis and management for conflcts and structural safety problems during construction: 2. Development and site trials. Automation in Construction, 20(2), 167-180.
|
| [22] |
Hwang, S. (2012). Ultra-wide band technology experiments for real-time prevention of tower crane collisions. Automation in Construction, 22, 545-553.
|
| [23] |
Jung, K., Chu, B., & Hong, D. (2013). Robot-based construction automation: An application to steel beam assembly (Part II). Automation in Construction, 32, 62-79.
|
| [24] |
Jung, K., (2013). An implementation of a teleoperation system for robotic beam assembly in construction. International Journal of Precision Engineering and Manufacturing, 14(3), 351-358.
|
| [25] |
Kamardeen, I. (2013). OHS Electronic Management Systems for Construction, Taylor and Francis: Hoboken.
|
| [26] |
Kelm, A., (2013). Mobile passive Radio Frequency Identification (RFID) portal for automated and rapid control of Personal Protective Equipment (PPE) on construction sites. Automation in Construction, 36, 38-52.
|
| [27] |
Kim, Y. S., (2009). A performance evaluation of a Stewart platform based Hume concrete pipe manipulator. Automation in Construction, 18(5), 665-676.
|
| [28] |
Kim, K. T., & Elernold, L. E. (2008). A comparison of two innovative technologies for safe pipe installation- “Pipeman” and the Stewart-Gough platform-based pipe manipulator. Automation in Construction, 17(3), 322-332.
|
| [29] |
Kim, S. K., Seo, J., & Russell, J. S. (2012). Intelligent navigation strategies for an automated earthwork system. Automation in Construction, 21, 132-147.
|
| [30] |
Kim, S. K., & Russell, J. S. (2003). Framework for an intelligent earthwork system- Part I. System architecture. Automation in Construction, 12(1), 1-13.
|
| [31] |
Ko, C. H. (2010). RFID 3D location sensing algorithms. Automation in Construction, 19(5), 588-595.
|
| [32] |
Lee, C., (2012). Analysis of field applicability of the rotation-controllable tower-crane hook block. Automation in Construction, 21, 81-88.
|
| [33] |
Lee, C., &Lee, g. (2014). Feasibility of beam erection with a motorized hook-block. Automation in Construction, 41(0), 25-32.
|
| [34] |
Lee, g., (2012). A BIM- and sensor-based tower crane navigation system for blind lifts. Automation in Construction, 26, 1-10.
|
| [35] |
Lee, g., (2009). A laser-technology-based lifting-path tracking system for a robotic tower crane. Automation in Construction, 18(7), 865-874.
|
| [36] |
Lee, U. K., (2009). Development of a mobile safety monitoring system for construction sites. Automation in Construction, 18(3), 258-264.
|
| [37] |
Li, Y. M., & Liu, C. L. (2012). Integrating field data and 3D simulation for tower crane activity monitoring and alarming. Automation in Construction, 27, 111-119.
|
| [38] |
Lu, W., Huang, g. Q., & Li, H. (2011). Scenarios for applying RFID technology in construction project management. Automation in Construction, 20(2), 101-106.
|
| [39] |
Maalek, R., & Sadeghpour, F. (2013). Accuracy assessment of Ultra-Wide Band technology in tracking static resources in indoor construction scenarios. Automation in Construction, 30, 170-183.
|
| [40] |
Ma, L., Luo, B. H., & Chen, H. R. (2013). Safety risk analysis based on a geotechnical instrumentation data warehouse in metro tunnel project. Automation in Construction, 34, 75-84.
|
| [41] |
Moon, H., (2014). Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces. Automation in Construction, 39, 93-105.
|
| [42] |
Naticchia, B., Vaccarini, M., & Carbonari, A. (2013). A monitoring system for real-time interference control on large construction sites. Automation in Construction, 29, 148-160.
|
| [43] |
Oloufa, A. A., Ikeda, M., & Oda, H. (2003). Situational awareness of construction equipment using gPS, wireless and web technologies. Automation in Construction, 12(6), 737-748.
|
| [44] |
Park, C. S., & Kim, H. J. (2103). A framework for construction safety management and visualization system. Automation in Construction, 33, 95-103.
|
| [45] |
Ray, S. J., & Teizer, J. (2013). Computing 3D blind spots of construction equipment: Implementation and evaluation of an automated measurement and visualization method utilizing range point cloud data. Automation in Construction, 36, 95-107.
|
| [46] |
Saidi, K. S., (2011). Static and dynamic performance evaluation of a commercially-available ultra wideband tracking system. Automation in Construction, 20(5), 519-530.
|
| [47] |
Seo, J., (2011). Task planner design for an automated excavation system. Automation in Construction, 20(7), 954-966.
|
| [48] |
Siebert, S., & Teizer, J. (2014). Mobile 3D mapping for surveying earthwork projects using an Unmanned Aerial Vehicle (UAV) system. Automation in Construction, 41(0), 1-14.
|
| [49] |
Taher, K. A. H., (1994). Robotics and automation in the construction of the sliding domes of King Fahd’s extension of the prophet’s holy mosque in Madinah, Kingdom of Saudi Arabia. Automation in Construction, 3(1), 3-9.
|
| [50] |
Teizer, J., Cheng, T., & Fang, Y. H. (2013). Location tracking and data visualization technology to advance construction ironworkers’ education and training in safety and productivity. Automation in Construction, 35, 53-68.
|
| [51] |
Teizer, J., (2010). Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system. Automation in Construction, 19(5), 630-640.
|
| [52] |
Teizer, J., Allread, B. S., & Mantripragada, U. (2010). Automating the blind spot measurement of construction equipment. Automation in Construction, 19(4), 491-501.
|
| [53] |
Wu, W. W., (2013). An integrated information management model for proactive prevention of struck-by-falling-object accidents on construction sites. Automation in Construction, 34, 67-74.
|
| [54] |
Wu, W. W., (2010). Towards an autonomous real-time tracking system of near-miss accidents on construction sites. Automation in Construction, 19(2), 134-141.
|
| [55] |
Yoo, W. S., (2012). Genetic algorithm-based steel erection planning model for a construction automation system. Automation in Construction, 24, 30-39.
|
| [56] |
Zhang, M. Z., & Fang, D. P. (2013). A continuous Behavior-Based Safety strategy for persistent safety improvement in construction Industry. Automation in Construction, 34, 101-107.
|
| [57] |
Zhang, J. P., & Hu, Z. Z. (2011). BIM- and 4D-based integrated solution of analysis and management for conflcts and structural safety problems during construction: 1. Principles and methodologies. Automation in Construction, 20(2), 155-166.
|
| [58] |
Zhang, S. J., (2013). Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules. Automation in Construction, 29, 183-195.
|
| [59] |
Zhou, C., Ding, L. Y., & He, R. (2013). PSO-based Elman neural network model for predictive control of air chamber pressure in slurry shield tunneling under Yangtze River. Automation in Construction, 36, 208-217.
|
| [60] |
Zhou, Y., Ding, L. Y., & Chen, L. J. (2013). Application of 4D visualization technology for safety management in metro construction. Automation in Construction, 34, 2536.
|
RIGHTS & PERMISSIONS
Higher Education Press and Springer-Verlag Berlin Heidelberg