Cyber–physical systems development for construction applications
Chinemelu J. ANUMBA, Abiola AKANMU, Xiao YUAN, Congwen KAN
Cyber–physical systems development for construction applications
Cyber–physical systems (CPS) are intended to facilitate the tight coupling of the cyber and physical worlds. Their potential for enhancing the delivery and management of constructed facilities is now becoming understood. In these systems, it is vital to ensure bi-directional consistency between construction components and their digital replicas. This paper introduces the key features of CPS and describes why they are ideally suited for addressing a number of problems in the delivery of construction projects. It draws on examples of research prototypes developed using surveys, field experiments, and prototyping methodologies, to outline the key features and benefits of CPS for construction applications and the approach to their development. In addition, it outlines the lessons learned from developing various systems for the design, construction and management of constructed facilities, which include building component placement and tracking, temporary structures monitoring, and mobile crane safety. The paper concludes that the construction industry stands to reap numerous benefits from the adoption of CPS. It states that the future direction of CPS in construction will be driven by technological developments and the extent to which CPS is deployed in new application areas.
cyber–physical systems / components / temporary structures / cranes / sensors
[1] |
Abdel-Wahab M, Vogl B (2011). Trends of productivity growth in the construction industry across Europe, US and Japan. Construction Management and Economics, 29(6): 635–644
CrossRef
Google scholar
|
[2] |
Akanmu A, Anumba C J, Messner J I (2013). Scenarios for cyber–physical systems integration in construction. Journal of Information Technology in Construction (ITcon), 18(12): 240–260
|
[3] |
Akanmu A, Anumba C J, Messner J I (2014). Active monitoring and control of light fixtures during building construction and operation: Cyber–physical systems approach. Journal of Architectural Engineering, 20(2): 04013008
CrossRef
Google scholar
|
[4] |
Anumba C J, Akanmu A, Messner J I (2010). Towards a cyber–physical systems approach to construction. In: Construction Research Congress 2010: Innovation for Reshaping Construction Practice, 528–537
|
[5] |
Bilal M, Oyedele L O, Qadir J, Munir K, Ajayi S O, Akinade O O, Owolabi H A, Alaka H A, Pasha M (2016). Big Data in the construction industry: A review of present status, opportunities, and future trends. Advanced Engineering Informatics, 30(3): 500–521
CrossRef
Google scholar
|
[6] |
Bordel B, Alcarria R, Robles T, Martín D (2017). Cyber–physical systems: Extending pervasive sensing from control theory to the Internet of Things. Pervasive and Mobile Computing, 40: 156–184
CrossRef
Google scholar
|
[7] |
Bureau of Labor Statistics (2018). Census of Fatal Occupational Injuries (CFOI)—current and revised data. Washington DC: US Department of Labor, Bureau of Labor Statistics
|
[8] |
Chen N, Xiao C, Pu F, Wang X, Wang C, Wang Z, Gong J (2015). Cyber–physical geographical information service-enabled control of diverse in-situ sensors. Sensors, 15(2): 2565–2592
CrossRef
Pubmed
Google scholar
|
[9] |
Dillon T S, Zhuge H, Wu C, Singh J, Chang E (2011). Web-of-things framework for cyber–physical systems. Concurrency and Computation, 23(9): 905–923
CrossRef
Google scholar
|
[10] |
Fabiano B, Currò F, Reverberi A P, Pastorino R (2008). A statistical study on temporary work and occupational accidents: Specific risk factors and risk management strategies. Safety Science, 46(3): 535–544
CrossRef
Google scholar
|
[11] |
Fang Y, Cho Y K, Durso F, Seo J (2018). Assessment of operator’s situation awareness for smart operation of mobile cranes. Automation in Construction, 85: 65–75
CrossRef
Google scholar
|
[12] |
Grant M, Pallett P F (2012). Temporary Works: Principles of Design and Construction. London: ICE Publishing
|
[13] |
Hinze J W, Teizer J (2011). Visibility-related fatalities related to construction equipment. Safety Science, 49(5): 709–718
CrossRef
Google scholar
|
[14] |
Kan C, Anumba C J, Fang Y, Messner J I (2020). CPS-based system for enhanced mobile crane safety. In: Anumba C J, Roofigari-Esfahan N, eds. Cyber–Physical Systems in the Built Environment. Berlin: Springer, 193–213
|
[15] |
Kan C, Fang Y, Anumba C J, Messner J I (2018a). A Cyber–Physical System (CPS) for planning and monitoring mobile cranes on construction sites. In: Proceedings of the Institution of Civil Engineers—Management, Procurement and Law. ICE Publishing, 171(6): 240–250
|
[16] |
Kan C, Zhang P, Fang Y, Anumba C J, Messner J I (2018b). A taxonomic analysis of mobile crane fatalities for CPS-based simulation. In: Mela K, Pajunen S, Raasakka V, eds. 17th International Conference on Computing in Civil and Building Engineering. Tampere, 5–7
|
[17] |
Lee I (2017). An exploratory study of the impact of the Internet of Things (IoT) on business model innovation: Building smart enterprises at fortune 500 companies. In: The Internet of Things: Breakthroughs in Research and Practice. IGI Global, 423–440
|
[18] |
Mckiniley J C (2011). After accidents, a call for regulation. The New York Times, 2011/08/24
|
[19] |
Mutter F, Gareis S, Schätz B, Bayha A, Grüneis F, Kanis M, Koss D (2011). Model-driven in-the-loop validation: Simulation-based testing of UAV software using virtual environments. In: 18th IEEE International Conference and Workshops on Engineering of Computer-Based Systems. Las Vegas, 269–275
|
[20] |
Navon R, Sacks R (2007). Assessing research issues in automated project performance control (APPC). Automation in Construction, 16(4): 474–484
CrossRef
Google scholar
|
[21] |
Neitzel R L, Seixas N S, Ren K K (2001). A review of crane safety in the construction industry. Applied Occupational and Environmental Hygiene, 16(12): 1106–1117
CrossRef
Pubmed
Google scholar
|
[22] |
Selecký M, Faigl J, Rollo M (2017). Mixed reality simulation for incremental development of multi-UAV systems. In: International Conference on Unmanned Aircraft Systems (ICUAS). Miami, FL: IEEE, 1530–1538
|
[23] |
Tang S, Shelden D R, Eastman C M, Pishdad-Bozorgi P, Gao X (2019). A review of building information modeling (BIM) and the Internet of Things (IoT) devices integration: Present status and future trends. Automation in Construction, 101: 127–139
CrossRef
Google scholar
|
[24] |
Turkan Y, Bosche F, Haas C T, Haas R (2012). Automated progress tracking using 4D schedule and 3D sensing technologies. Automation in Construction, 22: 414–421
CrossRef
Google scholar
|
[25] |
Whitaker S M, Graves R J, James M, McCann P (2003). Safety with access scaffolds: Development of a prototype decision aid based on accident analysis. Journal of Safety Research, 34(3): 249–261
CrossRef
Pubmed
Google scholar
|
[26] |
Xia F, Vinel A, Gao R, Wang L, Qiu T (2011). Evaluating IEEE 802.15.4 for cyber–physical systems. EURASIP Journal on Wireless Communications and Networking, 596397
|
[27] |
Yuan X, Anumba C J, Parfitt M K (2016). Cyber–physical systems for temporary structure monitoring. Automation in Construction, 66: 1–14
CrossRef
Google scholar
|
[28] |
Zhou J, Gilman E, Palola J, Riekki J, Ylianttila M, Sun J (2011). Context-aware pervasive service composition and its implementation. Personal and Ubiquitous Computing, 15(3): 291–303
CrossRef
Google scholar
|
/
〈 | 〉 |