A Coupled clustering, transfer learning, and ensemble learning approach for cutterhead thrust prediction and excavation safety early warning in water conveyance tunnel TBM operations
Pengbo YIN , Fangchan HE , Shengjin JIANG , Quan CHENG , Lei KOU
Water Resources and Hydropower Engineering ›› 2026, Vol. 57 ›› Issue (8) : 260 -273.
[Objective] Accurate prediction of Tunnel Boring Machine(TBM) cutterhead thrust is crucial for ensuring construction safety and improving excavation efficiency in long-distance water tunnel projects. However, traditional deep learning models such as LSTM, GRU, and Transformer, while capable of achieving high prediction accuracy, generally suffer from large parameter sizes, long training times, and poor adaptability to on-site data, making them unsuitable for real-time updates in practical engineering scenarios. [Methods] A rapid prediction and excavation safety early warning framework for TBM cutterhead thrust in long-distance water conveyance tunnels is proposed, based on the coupling of clustering, transfer learning, and ensemble learning. First, clustering algorithms are applied to classify the ascending phase data of cutterhead thrust into different variation forms, constructing sub-databases. Then, transfer learning is used to train variation form classification models, enhancing the adaptability to new data. Finally, an ensemble learning method is employed to achieve high-precision regression prediction of cutterhead thrust within each variation form sub-database, incorporating the Leading Averaged Force-Penetration Index(LAFPI) as a sensitive feature for identifying surrounding rock transitions, thus providing effective early warning. [Results] The result show that the cutterhead thrust prediction framework, with only 0. 015 billion parameters and just two minutes of training time, can achieve high-precision prediction(R2 > 0. 85) for cutterhead thrust data containing over 1, 000 time points. [Conclusion] Compared with traditional large neural network models, the training time is reduced by 86. 9%, and the model size is reduced by 97. 4%. The proposed framework, by integrating clustering analysis, transfer learning, and ensemble learning techniques, significantly improves real-time training and application efficiency. It possesses strong real-time prediction capabilities, effectively addressing the complex geological conditions in long-distance tunnel construction, and holds significant engineering application prospects, particularly in enhancing construction safety and excavation efficiency.
tunnel boring machine / cutterhead thrust / clustering algorithm / transfer learning / ensemble learning / safety warning / influence factors / TBM
/
| 〈 |
|
〉 |