Optimized joint water supply scheduling of reservoir groups using CPLEX
Jinqiu REN , Guanghui RAO , Lisheng ZHANG , Qiaoping FU , Hanqing LI
Water Resources and Hydropower Engineering ›› 2026, Vol. 57 ›› Issue (8) : 245 -259.
[Objective] With the frequent occurrence of extreme drought weather, urban water shortage has become a common challenge during rapid urbanization. To alleviate urban water shortage under tight supply-demand balance conditions, a technical framework for the construction of an optimized joint water supply scheduling model for multi-source urban water supply and the extraction of joint scheduling rules based on linear programming is established. [Methods] Taking the main urban area of Kunming as an example, a joint optimized scheduling model for water supply of reservoir groups was developed using CPLEX linear programming and the lexicographic method. The variable constraints of water supply capacity of water source projects under different storage conditions were considered. Using the long-term inflow series from 1956 to 2021, optimized scheduling studies were conducted for water demand in 2021 and 2025. Scheduling rules were summarized based on the optimized scheduling process, and a joint scheduling method for the reservoir groups to ensure water supply for the urban area of Kunming was proposed. [Results] The result indicate that the average annual runoff of the conventional water-source reservoir group in the main urban area of Kunming from 1956 to 2021 is 0. 621 billion m3. The actual water demand in 2021 is approximately 0. 480 billion m3, and the forecasted water demand in 2025 is about 0. 588 billion m3. Under the water-demand conditions of 2021 and 2025, the water-supply guarantee rates of joint dispatching of conventional water sources are 86% and 57%, respectively. When the Dez e Reservoir is included in the joint operation, the water-supply guarantee rates increase to 92% and 74%, respectively.Regarding the causes of water shortage in each supply zone, in the main urban area, 67. 9% of water shortages are attributed to the supply capacity limitations of Yunlong Reservoir, while 32. 1% are caused by insufficient water resources. In contrast, water shortages in the Qingshuihai area are entirely(100%) due to insufficient water resources. [Conclusion] The result indicate that the water supply in the main urban area of Kunming is under tight supply-demand balance conditions. When encountering dry or extremely dry years, the water supply will face great challenges. Resource-based water shortage and limitations in engineering water transmission capacity are the main causes of water shortage. The joint scheduling model of reservoir groups constructed using CPLEX can effectively coordinate the synergistic water supply process of multiple water sources. Through optimized scheduling, the water shortage problem under the normal year conditions in 2021 can be basically solved, and the water supply pressures under the conditions in 2025 can be significantly alleviated. Based on the optimized scheduling process, scheduling rules of “stable supply from primary water sources, regulation by auxiliary water sources, and supplementation by scattered small water sources” which adapt to the supply-demand characteristics and engineering system are proposed. These rules can provide a reference for the joint water supply scheduling of the water source reservoir groups in Kunming. Through the water supply scheduling simulation of the main urban area of Kunming, the adaptability of using the CPLEX linear programming solver for the joint optimal scheduling of reservoir groups is demonstrated, and a method for extracting joint scheduling rules for reservoir groups based on the optimized scheduling process is further explored. This can provide a theoretical basis and a practical framework for the optimized scheduling of multi-source water supply in similar water-scarce areas.
multi-source water scheduling / linear programming / lexicographic method / water resources management / urban water supply / Kunming City / emergency water supply / influencing factors
/
| 〈 |
|
〉 |