Load shedding scheme for the two-area system with linear quadratic regulator
Received date: 10 Aug 2012
Accepted date: 16 Oct 2012
Published date: 05 Mar 2013
Copyright
The power system is prone to many emergency conditions which may lead to emergency state of operation with decay in the system frequency. The dramatic change in the frequency can result in cascaded failure of the system. In order to avoid power system collapse, load shedding (LS) schemes are adopted with the optimal amount of load shed. This paper proposed a methodology in a two-area thermal-thermal system for finding the required amount of load to be shed for setting the frequency of the system within minimum allowable limits. The LS steps have been obtained based on the rate of change of frequency with the increase in load in steps. A systematic study has been conducted for three scenarios: the scheme with a conventional integral controller; the scheme with a linear quadratic regulator (LQR); and the scheme with an LQR and superconducting magnetic energy storage devices (SMES). A comparison of the results has been presented on the two-area system.
D. TYAGI , Ashwani KUMAR , Saurabh CHANANA . Load shedding scheme for the two-area system with linear quadratic regulator[J]. Frontiers in Energy, 2013 , 7(1) : 90 -102 . DOI: 10.1007/s11708-012-0224-8
1 |
Hazarika D, Sinha A K. Method for optimal load shedding in case of generation deficiency in power system. Electric Power and Energy Systems, 1998, 20(6): 411-420
|
2 |
Shandilya A, Gupta H, Sharma J. Method for generation rescheduling and load shedding to alleviate line overloads using local optimization. IEE Proceedings C: Generation, Transmission and Distribution, 1993, 140(5): 337-342
|
3 |
Thompson J G, Fox B. Adaptive load shedding for isolated power systems. I IEE Proceedings C: Generation, Transmission and Distribution, 1994, 141(4): 491-496
|
4 |
Concordia C, Fink L H, Poullikkas G. Load shedding on an isolated system. IEEE Transactions on Power Systems, 1995, 10(3): 1467-1472
|
5 |
Prasetijo D, Lachs W R, Sutanto D. A new load shedding scheme for limiting under frequency. IEEE Transactions on Power Systems, 1994, 9(3): 1371-1378
|
6 |
Taylor C W. Concepts of under-voltage load shedding for voltage stability. IEEE Transactions on Power Delivery, 1992, 7(2): 480-488
|
7 |
Anderson P M, Mirheydar M. A low-order system frequency response model. IEEE Transactions on Power Systems, 1990, 5(3): 720-729
|
8 |
Anderson P M, Mirheydar M. An adaptive method for setting under frequency load shedding relays. IEEE Transactions on Power Systems, 1992, 7(2): 647-655
|
9 |
Maliszewski R M, Dunlop R D, Wilson G L. Frequency actuated load shedding and restoration part I—Philosophy. IEEE Transactions on Power Apparatus and Systems, 1971, PAS-90(4): 1452-1459
|
10 |
Horowitz S H, Polities A, Gabrielle A F. Frequency actuated load shedding and restoration part II—Implementation. IEEE Transactions on Power Apparatus and Systems, 1971, PAS-90(4): 1460-1468
|
11 |
Rudez U, Mihalic R. Monitoring the first frequency derivative to improve adaptive under frequency load-shedding schemes. IEEE Transactions on Power Systems, 2011, 26(2): 839-846
|
12 |
Lokay H E, Burtnyk V. Application of under-frequency relays for automatic load shedding. IEEE Transactions on Power Apparatus and Systems, 1968, PAS-87(5): 1362-1366
|
13 |
Chuvychin V N, Gurov N S, Venkata S S, Brown R E. An adaptive approach to load shedding and spinning reserve control during under-frequency conditions. IEEE Transactions on Power Systems, 1996, 11(4): 1805-1810
|
14 |
Girgis A A, Mathure S. Application of active power sensitivity to frequency and voltage variations on load shedding. Electric Power Systems Research, 2010, 80(3): 306-310
|
15 |
Faranda R, Pievatolo A, Tironi E. Load shedding: a new proposal. IEEE Transactions on Power Systems, 2007, 22(4): 2086-2093
|
16 |
Wangdee W, Billinton R.Utilization of time varying event-based customer interruption cost load shedding schemes. International Journal of Electrical Power and Energy Systems, 2005, 27(9,10): 674-681
|
17 |
Tomsic T, Verbic G, Gubina F.Revision of the under frequency load-shedding scheme of the Slovenian power system. Electric Power Systems Research, 2007, 77(5,6): 494-500
|
18 |
Mahat P, Chen Z, Bak-Jensen B. Under-frequency load shedding for an islanded distribution system with distributed generators. IEEE Transactions on Power Delivery, 2010, 25(2): 911-918
|
19 |
Aponte E E, Nelson J K. Time optimal load shedding for distributed power systems. IEEE Transactions on Power Systems, 2006, 21(1): 269-277
|
20 |
Karimi M, Mohamad H, Mokhlis H, Bakar A H A. Under frequency load shedding scheme for islanded distribution network connected with mini hydro. Electric Power and Energy Systems, 2012, 42(1): 127-138
|
21 |
Sanaye-Pasand M, Seyedi H. New centralized adaptive under frequency load shedding algorithms. In: Proceedings of 2007 Large Engineering Systems Conference on Power Engineering, Montreal, Canada, 2007, 44-48
|
22 |
Seyedi H, Sanaye-Pasand M. New centralised adaptive load-shedding algorithms to mitigate power system blackouts. IET on Generation, Transmission & Distribution, 2008, 3(1): 99-114
|
23 |
Giroletti M, Farina M, Scattolini R. A hybrid frequency/power based method for industrial load shedding. Electric Power and Energy Systems, 2012, 35(1): 194-200
|
24 |
Tyagi D, Kumar A, Chanana S. Load shedding scheme for an interconnected hydro-thermal hybrid system with SMES. Frontiers in Energy, 2012, 6(3): 227-236
|
25 |
Abraham R J, Das D, Patra A. Automatic generation control of an interconnected hydrothermal power system considering SMES. Electrical Power and Energy Systems, 2007, 29(8): 571-579
|
26 |
Arifoglu U. SIMULINK Toolbox of MATLAB Version 7.6. Mathworks Corporation, 2008
|
/
〈 | 〉 |