Collections

Subway safety
Subway safety management is important to subway system management. At present, the construction and operation of the subway are encountering problems, such as the poor safety awareness of workers, uncertain factors at the project site, and difficulties in emergency management of the subway. For the construction  of a subway project, Lieyun DING et al. proposed that geological conditions and environmental impact control are the main measures to reduce the risk of subway engineering, and safety training on workers and safety monitoring are the main methods of safety control. In terms of the operation of the subway, Jiateng YIN et al. put forward a method of dispatching alternate trains in the event of a train outage to reduce safety accidents when the number of passengers increases. 
Publication years
Loading ...
Article types
Loading ...
  • Select all
  • RESEARCH ARTICLE
    Jiateng YIN, Yihui WANG, Tao TANG, Jing XUN, Shuai SU
    Frontiers of Engineering Management, 2017, 4(4): 418-427. https://doi.org/10.15302/J-FEM-2017044

    In large cities with heavily congested metro lines, unexpected disturbances often occur, which may cause severe delay of multiple trains, blockage of partial lines, and reduction of passenger service. Metro dispatchers have taken a practical strategy of rescheduling the timetable and adding several backup trains in storage tracks to alleviate waiting passengers from crowding the platforms and recover from such disruptions. In this study, we first develop a mixed integer programming model to determine the optimal train rescheduling plan with considerations of in-service and backup trains. The aim of train rescheduling is to frequently dispatch trains to evacuate delayed passengers after the disruption. Given the nonlinearity of the model, several linearization techniques are adapted to reformulate the model into an equivalent linear model that can be easily handled by the optimization software. Numerical experiments are implemented to verify the effectiveness of the proposed train rescheduling approach.

  • REVIEW ARTICLE
    Lieyun DING, Jie XU
    Frontiers of Engineering Management, 2017, 4(1): 4-19. https://doi.org/10.15302/J-FEM-2017015

    China is now in an era of large-scale metro construction. This paper reviews the nature of Chinese metro engineering with a specific focus on its organization and market mode, cost structure, safety control and schedule management. Then, an examination on recent research in metro engineering of the National Natural Science Foundation of China (NSFC) is also conducted, which indicates that information and automation based technologies are increasingly used in practice.