Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault zones with discontinuity layout optimization: A case study

{{article.zuoZheEn}}

PDF(2869 KB)
PDF(2869 KB)
Front. Struct. Civ. Eng. ›› 2019, Vol. 13 ›› Issue (6) : 1393-1404. DOI: 10.1007/s11709-019-0563-1
RESEARCH ARTICLE

Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault zones with discontinuity layout optimization: A case study

  • {{article.zuoZheEn}}
Author information +
History +

Highlights

{{article.highlightEn}}

Abstract

{{article.abstractEn}}

Author summary

{{article.authorSummayEn}}

Keywords

Cite this article

Download citation ▾
{{article.zuoZheEn_L}}. {{article.titleEn}}. Front. Struct. Civ. Eng., 2019, 13(6): 1393‒1404 https://doi.org/10.1007/s11709-019-0563-1

References

References

{{article.reference}}

RIGHTS & PERMISSIONS

{{article.copyright.year}} {{article.copyright.holder}}
Share on Mendeley
PDF(2869 KB)

Accesses

Citations

Detail

Sections
Recommended

/