1 |
Utilizing IFC for shield segment assembly in underground tunneling
|
|
Zhou Ying, Wang Yu, Ding Lieyun, Love Peter E.D., Automation in Construction
2018 93(null):178.
doi:10.1016/j.autcon.2018.05.016
|
2 |
Emerging contractual and legal risks from the application of building information modelling
|
|
Almarri Khalid, Aljarman Moshabab, Boussabaine Halim, Engineering, Construction and Architectural Management
2019 26(10):2307.
doi:10.1108/ECAM-06-2018-0224
|
3 |
Integration of building information modeling and project management in construction project life cycle
|
|
Wang Taige, Chen Han-Mei, Automation in Construction
2023 150(null):104832.
doi:10.1016/j.autcon.2023.104832
|
4 |
Building Information Modeling in the Architecture and Construction Industry
|
|
Jerome Jordan Faz Famadico , Advances in Technology Innovation
2023 8(2):121.
doi:10.46604/aiti.2023.9854
|
5 |
Keystone players in collaborative building information modeling a?? form of contribution in Japanese large-scale projects
|
|
Ishizawa Tsukasa, Journal of Information Technology in Construction
2022 27(null):685.
doi:10.36680/j.itcon.2022.034
|
6 |
Minimizing Cost Overrun in Rail Projects through 5D-BIM: A Conceptual Governance Framework
|
|
Hussain Osama A. I., Moehler Robert C., Walsh Stuart D. C., Ahiaga-Dagbui Dominic D., Buildings
2024 14(2):478.
doi:10.3390/buildings14020478
|