1 |
Planning behind Closed Doors: Unlocking Large-Scale Urban Development Projects Using the Stakeholder Approach on Tenerife, Spain
|
|
H??bscher Marcus, Land
2022 11(3):390.
doi:10.3390/land11030390
|
2 |
An Analytical Network Process model for risks prioritisation in megaprojects
|
|
Boateng Prince, Chen Zhen, Ogunlana Stephen O., International Journal of Project Management
2015 33(8):1795.
doi:10.1016/j.ijproman.2015.08.007
|
3 |
A fuzzy-based decision support system for ranking the delivery methods of mega projects
|
|
Al Nahyan Moza Tahnoon, Hawas Yaser E., Raza Mohsin, Aljassmi Hamad, Maraqa Munjed A., Basheerudeen Basil, Mohammad Mohammad Sherif, International Journal of Managing Projects in Business
2018 11(1):122.
doi:10.1108/IJMPB-06-2017-0055
|
4 |
Design, Material Selection and Manufacturing for Sustainable Construction: An Analytical Network Process Approach
|
|
Haruna A, Shafiq N, Montasir O A, Haruna S, Mohammed M, IOP Conference Series: Earth and Environmental Science
2020 476(1):012006.
doi:10.1088/1755-1315/476/1/012006
|
5 |
Social responsibility in infrastructure mega-projects: A case study of ecological compensation for Sousa chinensis during the construction of the Hong Kong-Zhuhai-Macao Bridge
|
|
LIU Zheming, WANG Liangyan, SHENG Zhaohan, GAO Xinglin, Frontiers of Engineering Management
2018 null(null):null.
doi:10.15302/J-FEM-2018084
|
6 |
Opaque Urban Planning. The Megaproject Santa Cruz Verde 2030 Seen from the Local Perspective (Tenerife, Spain)
|
|
H??bscher Marcus, Ringel Johannes, Urban Science
2021 5(1):32.
doi:10.3390/urbansci5010032
|
7 |
Avoiding the innovation island in infrastructure mega-project
|
|
CHEN Hongquan, SU Quanke, ZENG Saixing, SUN Daxin, SHI Jonathan Jingsheng, Frontiers of Engineering Management
2018 null(null):null.
doi:10.15302/J-FEM-2018073
|