Please wait a minute...
 首页  期刊列表 期刊订阅 开放获取 关于我们
English
在线预览  |  当期目录  |  过刊浏览  |  热点文章  |  下载排行
Frontiers of Engineering Management    2017, Vol. 4 Issue (1) : 4-19     https://doi.org/10.15302/J-FEM-2017015
REVIEW ARTICLE
中国地铁建设的综述—组织、市场、成本、安全与进度
丁烈云(), 徐捷
华中科技大学土木工程与力学学院建设管理系
A review of metro construction in China: Organization, market, cost, safety and schedule
Lieyun DING(), Jie XU
Hubei Engineering Research Center for Virtual, Safe and Automated Construction, Wuhan 430074, China; Department of Construction Management, School of Civil Engineering and Mechanics, Huazhong University of Science and Technology, Wuhan 430074, China
全文: PDF(942 KB)   HTML
导出: BibTeX | EndNote | Reference Manager | ProCite | RefWorks
摘要 

中国现在正处于一个大规模地铁建设的时代。本文对中国地铁工程的性质进行了综述,并重点关注其组织与市场模式、成本结构、安全控制和进度管理。同时,对中国国家自然科学基金(NSFC)有关地铁工程近期研究的检查和讨论表明信息和自动化技术越来越多地被应用于实践。

Abstract

China is now in an era of large-scale metro construction. This paper reviews the nature of Chinese metro engineering with a specific focus on its organization and market mode, cost structure, safety control and schedule management. Then, an examination on recent research in metro engineering of the National Natural Science Foundation of China (NSFC) is also conducted, which indicates that information and automation based technologies are increasingly used in practice.

Keywords metro engineering      construction status      construction challenges      NSFC     
通讯作者: 丁烈云     E-mail: dly@hust.edu.cn
在线预览日期:    发布日期: 2017-04-19
服务
推荐给朋友
免费邮件订阅
RSS订阅
作者相关文章
Lieyun DING
Jie XU
引用本文:   
Lieyun DING,Jie XU. A review of metro construction in China: Organization, market, cost, safety and schedule[J]. Front. Eng, 2017, 4(1): 4-19.
网址:  
https://journal.hep.com.cn/fem/EN/10.15302/J-FEM-2017015     OR     https://journal.hep.com.cn/fem/EN/Y2017/V4/I1/4
Organization type Management framework Function assignment Case
One metro corporation One metro headquarter including eight functional departments, two offices and one technical committee. • Metro headquarter: Responsible for the construction and operation of Guangzhou Rapid Rail Transit System as well as the development of real estate along the lines;
• Guangzhou Municipal Planning Commission Metro Finance Office: Responsible for financing.
Guangzhou Metro
Several different professional companies One metro headquarter with six functional departments and several subsidiary companies responsible for investment, construction etc. • Metro Investment Company: As a real owner, responsible for financing;
• Metro Construction Company: As an executive owner, responsible for construction.
Tianjin, Nanjing, and Shenzhen Metro
Four professional companies responsible for financing, construction, operation and supervision respectively. • Shen Tong Company: As a real owner, responsible for investment and financing;
• Metro Construction Company: Responsible for metro construction;
• Metro Operation Company: Responsible for metro operation;
• Rail Transit Administration: Responsible for metro industrial supervision.
Shanghai Metro
One enterprise group including the construction company and operating company etc. • Urban Facility Investment Company: Responsible for planning and investment;
• Mero Construction Company: Responsible for construction management;
• Metro Operation Company: Responsible for operation;
• State owned Assets Management Committee: Responsible for supervision of the three companies.
Beijing Metro
Tab.1  Chinese metro corporation organization modes (Liu, 2015)
Investment and financing mode Period Case
Government investment Early stage Beijing Metro Lines 1 and 2 (Chen, 2005)
Government-led debt financing Early and middle stages Shanghai Metro Line 1 (Xia, 2000), Beijing Metro Line Fu8 (Song and Chen, 2015)
Project financing
????BT Middle and late stages Beijing Metro Olympic Branch Line (Zhu et al., 2014a), Shenzhen Metro Line 5 (Wei et al., 2012)
????BOT Middle and late stages Shenzhen Metro Line 4 (Zhang et al., 2006), Nanjing Metro Line 2 (Yao et al., 2013)
Diversified financing (PPP) Currently Beijing Metro Line 4 (Wang, 2005), Nanjing Metro Line 1 (Zhang, 2014b)
Tab.2  Evolvement of Chinese metro investment and financing modes
Fig.1  Proportions of different costs of the B-6 group metro engineering
Fig.2  Statistical analysis of safety accidents in domestic metro construction in recent five years
Fig.3  The proportion and distribution of NSFC scientific programs of metro engineering (source: http://npd.nsfc.gov.cn/granttype1!index.action)
Fig.4  Number of research programs of the top 11 funded institutions
Fig.5  Amount of funds of the top 10 funded institutions
Fig.6  Annual changes of (a) program number and (b) the amount of funds
No. City Classification Population/106 Economy/(109 CNY) Construction plan
Urban Area Total GDP Local taxation Round Period Mileage/km
1 Beijing Municipality 1600 2171 2297 472 Early Stage 1969–2003 114.10
Round 1 2007–2016 536.40
Round 2 2015–2021 262.90
2 Shanghai Municipality 2415 2415 2497 552 Round 1 2003–2010 567.00
Round 2 2010–2015 250.55
3 Tianjin Municipality 900 1547 1654 267 Round 1 2005–2015 205.10
Round 2 2015–2020 228.10
4 Chongqing Municipality 830 3017 1572 216 Round 1 2006–2014 83.85
Round 2 2012–2020 215.04
5 Guangzhou Provincial capital 1263 1350 1810 512 Round 1 2003–2010 290.50
Round 2 2012–2018 228.90
6 Nanjing Provincial capital 642 824 972 102 Round 1 2004–2015 119.00
Round 2 2016–2021 196.40
7 Hangzhou Provincial capital 640 902 1005 224 Round 1 2005–2010 82.20
Round 2 2013–2019 106.60
8 Chengdu Provincial capital 712 1466 1080 117 Round 1 2005–2015 108.00
Round 2 2013–2020 262.40
Round 3 2016–2020 124.40
9 Wuhan Provincial capital 700 1061 1091 125 Round 1 2004–2010 59.70
Round 2 2010–2017 142.60
Round 3 2015–2021 173.50
10 Xi’an Provincial capital 600 871 581 65 Round 1 2006–2016 92.90
Round 2 2013–2021 65.10
11 Shenyang Provincial capital 630 829 728 61 Round 1 2003–2010 40.85
Round 2 2012–2018 118.00
12 Changchun Provincial capital 267 779 553 108 Early Stage 2000–2002 14.00
Round 1 2003–2010 37.50
Round 2 2010–2019 67.70
13 Urumqi Provincial capital 265 355 268 37 Round 1 2012–2019 47.90
Round 2 2016–2021 41.80
14 Guiyang Provincial capital 300 462 289 37 Round 1 2010–2020 56.00
Round 2 2016–2022 114.10
15 Wuxi Prefecture-level city 360 481 852 83 Round 1 2008–2015 56.00
Round 2 2013–2018 56.90
16 Wuhu Prefecture-level city 164 365 246 26 Round 1 2016–2020 46.90
17 Luoyang Prefecture-level city 197 700 351 29 Round 1 2008–2016 41.30
  Table A1 Statistics of metro construction plans of some domestic cities by 2015 (Source: http://www.sdpc.gov.cn/zcfb/zcfbtz/201501/t20150116_660386.html)
1 Beijing Morning Post (2016). Beijing subway investment from 150 million km per kilometer cost rose to $1 billion 100 million. , 2016-12-12 (in Chinese)
2 Chen H, Yuan D, Wang F (2015). Research on safety control technology of metro shield tunneling under high speed rail in weak stratum. China Civil Engineering Journal, (s1): 256–260 (in Chinese)
3 Chen J (2014). Introduction to Urban Rail Transit. Changsha: Central South University Press (in Chinese)
4 Chen L (2006). PPP financing mode in construction of urban rail transit systems. China Municipal Engineering, (3): 60–63, 94 (in Chinese)
5 Chen R (2005). Research on investment and financing mechanism of China’s subway. Dissertation for the Master’s Degree. Changsha: Central South University (in Chinese)
6 Chen W, Long Z, Li J (2013). Research on real time dynamic monitoring of subway construction. Journal of Underground Space and Engineering, 2: 344–351 (in Chinese)
7 China Urban Rail Transit Association (2016). Statistics and analysis of urban rail transit in 2015. Urban Rapid Rail Transit, 29(4): 6–11 (in Chinese)
8 Department of Transportation (2012). Introduction to Urban Rail Transit Management. Beijing: China Communications Press (in Chinese)
9 Ding L, Guo S (2015). Study on big data-based behavior modification in metro construction. Frontiers of Engineering Management, 2(2): 131–136
https://doi.org/10.15302/J-FEM-2015037
10 Ding L, Zhou C (2012). Research on automatic identification and early warning of subway construction safety risk in complex environment. Chinese Engineering Science, 12: 85–93 (in Chinese)
11 Ding Z (2014). Study on influence of shield tunneling on adjacent buildings and deformation prediction. Dissertation for the Master’s Degree. Hangzhou: Zhejiang University (in Chinese)
12 Ding Z, Liao Q, Shan X (2015). Large boulders formation of bored pile construction technology. Construction Technique, 44(23): 59–60 (in Chinese)
13 Du J (2004). Research on Shenzhen metro construction project management. Dissertation for the Master’s Degree. Beijing: Tsinghua University (in Chinese)
14 Du Y (2015). Study on land expropriation and demolition in Guangzhou Metro Construction. Dissertation for the Master’s Degree. Kunming: Yunnan University of Finance and Economics (in Chinese)
15 Editorial Department of Chinese Journal of Highway (2015). A summary of the academic research on Chinese tunnel engineering 2015. Chinese Journal of Highway, 28(5): 1–65 (in Chinese)
16 Gao Y (2010). Research on the project management of Dalian Metro. Dissertation for the Master’s Degree. Changchun: Jilin University (in Chinese)
17 Ge L (2009). Some views on schedule management in engineering construction. Shanxi Architecture, 35(30): 201–202 (in Chinese)
18 Gu M (2011). Present situation and prospect of urban rail transit in China. China Railway, 10: 53–54 (in Chinese)
19 Guo S, Luo H, Kong L (2015). Content based safety training for subway construction workers. Journal of Civil Engineering and Management, 32(4): 53–58 (in Chinese)
20 He C, Jiang Z, Liu C (2009). Construction technology of shallow buried tunnel. Municipal Technology, 27(3): 274–279 (in Chinese)
21 He F (2004). On BOT and BT project investment. Tunnel Construction, 24(4): 68–69 (in Chinese)
22 Hong K (2015). Development and prospect of tunnel and underground engineering in China. Tunnel Construction, 2: 95–107 (in Chinese)
23 Huang D, Zhou Y, Dai S (2010). Construction technology of shield tunneling through historic buildings in Shanghai the Bund tunnel. Construction Technique, 9: 43–46 (in Chinese)
24 Jin H, Liu Y, Zhong Q (2008). Current situation and prospect of urban rail transit safety risk management in China. China Survey, 2: 216–220 (in Chinese)
25 Jin H, Zhang J, Wu F, Ren G (2014). Theory and Practice of Urban Rail Transit Engineering Monitoring. Beijing: China Building Industry Press (in Chinese)
26 Li H, Bao L (2007). Shenyang metro project schedule control. Modern Urban Rail Transit, 3: 50–51 (in Chinese)
27 Li L (2014). Study on the method of judging the safety degree of super large diameter shield passing through high risk pipeline and its measurement. Modern Tunnel Technology, 51(5): 134–138 (in Chinese)
28 Li Q, Guo J, Liu C (2014). Construction risk management of Shenzhen Metro Line 5. Railway Engineering, 5: 47–49 (in Chinese)
29 Li X (2011). Research on safety risk early warning index system of subway construction. Dissertation for the Master’s Degree. Wuhan: Huazhong University of Science and Technology (in Chinese)
30 Liu G, Du W (1997). Development and prospect of underground engineering construction technology in China. Building Technology, 7: 480–483 (in Chinese)
31 Liu K D (2011). Research and Application of Security System for Urban Rail Transit System. Beijing: China Architecture & Building Press (in Chinese)
32 Liu L (2015). Study on financing mode of city subway construction—Taking Nanchang subway as a case. Dissertation for the Doctoral Degree. Nanchang: Nanchang University (in Chinese)
33 Ministry of Commerce of the People’s Republic of China (2015). Rail transit industry investment promotion report. , 2017-3-1 (in Chinese)
34 Ministry of Housing and Urban Rural Development of People’s Republic of China (2017). Accident Letters. , 2017-2-8 (in Chinese)
35 Qian Q, He Z (2004). The development of rail transit and the application of high and new technology. Railway Construction Technology, 1: 1–5 (in Chinese)
36 Ren J, Li Q, Zheng Z (2014). Study on deformation law of ground surface and adjacent buildings induced by shield. Journal of Railway Engineering Society, (1): 69–74 (in Chinese)
37 Song J (2013). Research on schedule management of rail transit construction project based on critical chain technology. Dissertation for the Master’s Degree. Zhengzhou: Henan University of Technology (in Chinese)
38 Song J, Chen G (2015). Research on the main problems and countermeasures of investment and financing mode of China’s subway projects. Building Economy, 36(11): 29–32 (in Chinese)
39 Song X (2001). The sustainable development of Shanghai rail transit. Urban Mass Transit, 4(4): 47–50 (in Chinese)
40 Sun Y (2014). Exploration on engineering management practice of China’s high speed railways. Frontiers of Engineering Management, 1(3): 232–240
https://doi.org/10.15302/J-FEM-2014043
41 Sun Y, Guan F (2012). Influence of shield tunneling on settlement of masonry structure buildings. China Railway Science, 33(4): 38–44 (in Chinese)
42 Sureeyatanapas P, Yang J B, Bamford D (2014). Evaluation of corporate sustainability. Frontiers of Engineering Management, 1(2): 176–194
https://doi.org/10.15302/J-FEM-2014025
43 Tao L, Li J, Wang G (2013). The application of CRD+ top support control technology in the project of closedown. Journal of Railway Engineering Society, 30(7): 74–79 (in Chinese)
44 Wang H, Cui T (2013). Analysis on influence of shield tunnel construction on underground pipeline. Journal of Underground Space and Engineering, 9(2): 365–370 (in Chinese)
45 Wang L (2016). Technical and Economic Indexes of Urban Rail Transit Project. Beijing: China Architecture & Building Press (in Chinese)
46 Wang M (2003). China is the world’s largest and most complex tunnel and underground engineering, the fastest growing country in the future. Railway Standard Design, 1: 1–4 (in Chinese)
47 Wang Q (2005). Study on the application of PPP model in infrastructure construction in China. Dissertation for the Master’s Degree. Wuhan: Wuhan University of Technology (in Chinese)
48 Wang M (2014). Present situation, existing problems and development ideas of shield tunneling machine in China. Tunnel Construction, 34(3): 179–187 (in Chinese)
49 Wang T, Xu L, Zhao N (2016). Study on the influencing factors and the ways of the construction of subway station. Journal of Railway Engineering Society, 5: 89–92, 115 (in Chinese)
50 Wang W (2012a). Protection scheme of shield tunnel under the West to East Gas Pipeline. Journal of Railway Engineering Society, 29(10): 70–74 (in Chinese)
51 Wang X (2012b). Construction technology of special geological loess tunnel. Journal of Railway Engineering Society, 29(3): 96–100 (in Chinese)
52 Wang Y, Chen W, Zhang W (2013). Research on the construction of hierarchical monitoring index system for urban rail transit engineering. Journal of Civil Engineering and Management, 3: 97–102 (in Chinese)
53 Wang Z, Wang M (2002). Influence of shield construction on surrounding buildings and its treatment measures. Chinese Journal of Safety Science, 2: 48–52 (in Chinese)
54 Webb C, Gao L, Song L (2015). Schedule compression impact on construction project safety. Frontiers of Engineering Management, 2(4): 344–350
https://doi.org/10.15302/J-FEM-2015059
55 Wei G, Hong J, Wei X (2012). Analysis of additional load on adjacent underground pipelines caused by double circular shield construction. Rock Soil Mechanics, 33(6): 783–790 (in Chinese)
56 Wu X, Chen Y, Zhang L (2013). Study on safety monitoring and early warning management and evaluation criteria for metro construction. Journal of Railway Engineering Society, 5: 107–111 (in Chinese)
57 Wu T (1990). Grouting reinforcement technology. Exploration Engineering, 2: 49–55 (in Chinese)
58 Xia Y (2000). Innovation of financing mode of metro line two project. Shanghai Urban Management, 5: 14–15 (in Chinese)
59 Xiao M, Guo S, Yu Q (2015). Effect analysis of subway construction safety training based on graphic language. Journal of Civil Engineering and Management, 1: 59–64 (in Chinese)
60 Xu J (2004). The application of freezing method in the construction of Shanghai subway connection passage. China Municipal Engineering, (5): 63–65 (in Chinese)
61 Xu S, Luo H (2014). Worker behavior safety training system based on graphic language. Journal of Civil Engineering and Management, 3: 51–55, 77 (in Chinese)
62 Xu Z, Han Q, Zheng G (2013). Measurement and analysis of the influence of metro tunnel on historic buildings. Journal of Geotechnical Engineering, 2: 364–374 (in Chinese)
63 Yan X, Ye Y, Zhang M (2012). Analysis on the influence of subway tunnel under existing railway bridge construction. Railway Engineering, 6: 84–85 (in Chinese)
64 Yang K (2009). Study on the protection of ancient buildings in Xi’an subway construction. Dissertation for the Master’s Degree. Beijing: China University of Geosciences (in Chinese)
65 Yang P, Yu C, Dong C (2003). Application of artificial freezing method in Nanjing subway station. Rock Soil Mechanics, S2: 388–391 (in Chinese)
66 Yang W (2014). Study of sustainable urban rail transit development model in China. Frontiers of Engineering Management, 1(2): 195–201
https://doi.org/10.15302/J-FEM-2014026
67 Yang X, Liu D, Zhang F (2010). Study on the stability of foundation pit support in open excavation method of subway tunnel. Journal of Underground Space and Engineering, 6(3): 516–520 (in Chinese)
68 Yang X, Wen K (2010). Construction technology of shield tunnel crossing historical relics. In: Key Technology Forum of Urban Rail Transit. Shanghai (in Chinese)
69 Yao Y, Yang J, Wang Z (2013). The influence of foundation pit excavation on the deformation of tunnel and pipeline is analyzed. Journal of Underground Space and Engineering, 9(S2): 2029–2033 (in Chinese)
70 Yao Z, Wang H, Wang J (2006). New development of grouting reinforcement technology. Mining Engineering in China, 35(4): 31–34 (in Chinese)
71 You L, Wang X, Gong Y (2012). Study on the foundation treatment technology of shield tunnel under new railway station. Journal of Railway Engineering Society, 6: 104–108 (in Chinese)
72 Yu J (2007). Reflections on the problems of land acquisition and demolition. Zhejiang Land and Resources, 11: 22–24 (in Chinese)
73 Yuan J (2015). Analysis on the schedule management of metro engineering. Shanxi Architecture, 14: 245–246 (in Chinese)
74 Zhai J (2009). Construction technology of expansive soil tunnel. Railway Construction Technology, (1): 149–151 (in Chinese)
75 Zhan X, Liu H (2003). Project management and schedule control of Guangzhou Metro Line 2. Research on Urban Rail Transit, 6(6): 94–97 (in Chinese)
76 Zhang J (2014a). Risk assessment method of metro shield tunnel based on Bayesian network. Research on Urban Rail Transit, 3: 30–34 (in Chinese)
77 Zhang M, Liu X, Du Y (2013). Analysis of the influence of shield tunneling on adjacent buildings. Journal of Beijing University of Technology, 39(2): 214–219 (in Chinese)
78 Zhang Y (2014b). Research on PPP project management mode of Nanjing metro. Reform & Openning, 19: 90–92 (in Chinese)
79 Zhang Y, Wang J, Lv S (2006). Research on the financing model of the 2 phase of Shenzhen metro line four. Construction Economics, 9: 19–22 (in Chinese)
80 Zhang Y, Hui G, Su Y (2008). Construction technology of a special stratum of rock and sand and gravel in a shield section of Beijing Metro Line 4. Modern Tunnel Technology, (S1): 447–451 (in Chinese)
81 Zhang Y (2009). Study on the management system and mechanism of Chinese metro. China Bidding, 5: 20–23 (in Chinese)
82 Zhang Z, Zhang M (2013). Deformation prediction and construction control of earth pressure balance shield tunnel crossing tunnel in soft soil. Chinese Journal of Rock Mechanics and Engineering, (S2): 3428–3439 (in Chinese)
83 Zhao Q (2013). Construction technology of shield tunneling through ancient buildings. Urban Construction Theory, 12 (in Chinese)
84 Zhou S, Rong J, Chen L (2013). A single large diameter double subway shield tunnel construction and monitoring. Journal of Underground Space and Engineering, 9(2): 365–372 (in Chinese)
85 Zhou W (2006). Study on the influence of Wuhan Yangtze River Tunnel Construction on surrounding historic buildings. Dissertation for the Master’s Degree. Wuhan: Huazhong University of Science and Technology (in Chinese)
86 Zhou Y, Zhou C, Wang N (2011). Research and application of 4D schedule control system for subway project based on linear graph. China Civil Engineering Journal, (S1): 209–214 (in Chinese)
87 Zhu G (2014). China’s engineering education: Situation & Outlook. Frontiers of Engineering Management, 1(1): 105–112
https://doi.org/10.15302/J-FEM-2014010
88 Zhu H, Ding W, Qiao Y (2014a). The control system and its application of shield tunnel. Journal of Geotechnical Engineering, 11: 1983–1993 (in Chinese)
89 Zhu H, Ding W, Qiao Y, Xie D (2014b). Micro-disturbed construction control technology system for shield driven tunnels and its application. Chinese Journal of Geotechnical Engineering, 36(11): 1983–1993 (in Chinese)
No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
版权所有 © 2015 高等教育出版社.
电话: 010-58556848 (技术); 010-58556485 (订阅) E-mail: subscribe@hep.com.cn