SUPER ENGINEERING
Fully automatic container terminals of Shanghai Yangshan Port phase IV
Jack Xunjie LUO()
Tianjin Port (Group) Co., Ltd., Tianjin 300461, China
全文: PDF(2692 KB)   HTML
导出: BibTeX | EndNote | Reference Manager | ProCite | RefWorks
Abstract

Engineering Owner: Construction Headquarters of Yangshan Deep-water Port Phase IV Project of Shanghai International Shipping Center

Designer: CCCC Third Harbor Consultants Co., Ltd.

Civil Constructer: China State Construction Harbor Construction Co., Ltd.;

CCCC Third Harbor Engineering Co., Ltd.

Equipment Manufacturer: Shanghai Zhenhua Port Machinery Co., Ltd.

Software Developer and System Integrator: Shanghai Harbor e-Logistics Software Co., Ltd. of Shanghai International Port (Group) Co., Ltd.

Supervisor: Shanghai Far East Waterway Engineering Construction Supervision and Consultation Co., Ltd.;

Shanghai Donghua Construction Management Co., Ltd.;

Jinghua Engineering Supervision Co., Ltd. under CCCC Water Transportation Consultants Co., Ltd.

Operator: Shangdong Branch, Shanghai International Port (Group) Co., Ltd.

Keywords Yangshan Port      automated equipment      intelligent system      container terminals      port engineering     
最新录用日期:    在线预览日期:    发布日期: 2019-09-04
服务
推荐给朋友
免费邮件订阅
RSS订阅
作者相关文章
Jack Xunjie LUO
引用本文:   
Jack Xunjie LUO. Fully automatic container terminals of Shanghai Yangshan Port phase IV[J]. Front. Eng, 2019, 6(3): 457-462.
网址:  
https://journal.hep.com.cn/fem/EN/10.1007/s42524-019-0053-0     OR     https://journal.hep.com.cn/fem/EN/Y2019/V6/I3/457
Fig.1  A glimpse of the fully automated terminals of Yangshan phase IV.
Fig.2  The quay apron of Yangshan phase IV.
Fig.3  A panorama of Yangshan phase IV project in equipment commissioning.
Fig.4  Remotely controlled automated quay cranes (RC-AQCs).
Fig.5  Automated rail-mounted gantries (ARMGs) in Yangshan phase IV.
Fig.6  AGVs using automatically-replaced batteries which supports automated lifting.
Fig.7  Structures of TOS and ECS.
Fig.8  Nine AQCs work together to handle a trip-E ultra-large ship.